Laserfiche WebLink
K O <br /> College Park at Mountain House Specific Plan HI <br /> Mitigation Monitoring and Reporting Program <br /> Implementation <br /> Implementation&Verification <br /> S Mitigation Measure Timing/Schedule Responsibility Action Date <br /> Completed <br /> m <br /> n maintenance responsibilities; <br /> < Specify the pollutants that are likely to be used <br /> CD <br /> o during construction that could be present in <br /> ?_ stormwater drainage and non-stormwater <br /> U1JVI16lSVJ <br /> < Specify BMP inspection protocols to ensure that <br /> the BMPs are effective and ensure that the <br /> 3 monitoring is conducted if nonvisible pollutants <br /> are inadvertently discharged into stormwater. <br /> < Identify construction techniques that will reduce <br /> the potential for runoff; <br /> < Identify the erosion and sedimentation control <br /> measures to be implemented; <br /> < Specify spill prevention and contingency <br /> measures; <br /> n < Identify the types of materials used for <br /> o equipment operation; <br /> < Identify measures to prevent or clean up spills of <br /> D hazardous materials used for equipment <br /> m <br /> operation and hazardous waste; <br /> RL <br /> m < Identify emergency procedures for responding to <br /> spills; <br /> < Identify BMWs that shall be used in all <br /> d subsequent site-development activities; <br /> < Identify personnel= YP training requirements and <br /> cn 0procedures that will be used to ensure that <br /> CO workers are aware of permit requirements and <br /> dQ proper installation and performance inspection <br /> i5 methods for specified BMPs; <br /> n < Identify the appropriate personnel responsible for <br /> csupervisory duties related to implementation of <br /> the SWPPP;and <br /> < Require all construction contractors to retain a <br />