My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006226
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOUNTAIN HOUSE
>
22261
>
2600 - Land Use Program
>
PA-0600161
>
SU0006226
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2019 2:19:14 PM
Creation date
9/6/2019 10:18:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006226
PE
2611
FACILITY_NAME
PA-0600161
STREET_NUMBER
22261
Direction
S
STREET_NAME
MOUNTAIN HOUSE
STREET_TYPE
PKWY
City
MOUNTAIN HOUSE
ENTERED_DATE
8/29/2006 12:00:00 AM
SITE_LOCATION
22261 S MOUNTAIN HOUSE PKWY
RECEIVED_DATE
8/28/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\M\MOUNTAIN HOUSE PKWY\22261\PA-0600161\SU0006226\MISC.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
996
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
K O <br /> College Park at Mountain House Specific Plan HI <br /> Mitigation Monitoring and Reporting Program <br /> Implementation <br /> Implementation&Verification <br /> S Mitigation Measure Timing/Schedule Responsibility Action Date <br /> Completed <br /> m <br /> n maintenance responsibilities; <br /> < Specify the pollutants that are likely to be used <br /> CD <br /> o during construction that could be present in <br /> ?_ stormwater drainage and non-stormwater <br /> U1JVI16lSVJ <br /> < Specify BMP inspection protocols to ensure that <br /> the BMPs are effective and ensure that the <br /> 3 monitoring is conducted if nonvisible pollutants <br /> are inadvertently discharged into stormwater. <br /> < Identify construction techniques that will reduce <br /> the potential for runoff; <br /> < Identify the erosion and sedimentation control <br /> measures to be implemented; <br /> < Specify spill prevention and contingency <br /> measures; <br /> n < Identify the types of materials used for <br /> o equipment operation; <br /> < Identify measures to prevent or clean up spills of <br /> D hazardous materials used for equipment <br /> m <br /> operation and hazardous waste; <br /> RL <br /> m < Identify emergency procedures for responding to <br /> spills; <br /> < Identify BMWs that shall be used in all <br /> d subsequent site-development activities; <br /> < Identify personnel= YP training requirements and <br /> cn 0procedures that will be used to ensure that <br /> CO workers are aware of permit requirements and <br /> dQ proper installation and performance inspection <br /> i5 methods for specified BMPs; <br /> n < Identify the appropriate personnel responsible for <br /> csupervisory duties related to implementation of <br /> the SWPPP;and <br /> < Require all construction contractors to retain a <br />
The URL can be used to link to this page
Your browser does not support the video tag.