Laserfiche WebLink
1 ( ( ( ( ( l l f ( f ( ( ( ( t ( F ( ( f f C C <br /> Cnn <br /> College Park at Mountain House Specific Plan III <br /> m Mitigation Monitoring and Reporting Program <br /> RL Implementation&Verification <br /> Mitigation Measure Timing/Schedule Implementation <br /> Responsibility Action Date <br /> Completed <br /> _ <br /> w qualified biologist and DFG determine it would <br /> = not be likely to adversely affect the nest. <br /> Monitoring of the nest by a qualified biologist <br /> 7o may be required if the activity has potential <br /> Cn adversely affect the nest. <br /> San Joaquin Kit Fox Before construction SJCOG,in <br /> a < To minimize the potential for destruction of an (surveys to be consultation with <br /> occupied burrow and direct take of a kit fox,a completed no more USFWS and DFG <br /> pre-construction survey for active and potential kit than 30 days and no <br /> fox dens shall be conducted by a qualified less than 14 days <br /> biologist no more than 30 days and no less than 14 before construction <br /> days before the beginning of ground disturbance activities) <br /> m or construction activity.The survey shall include <br /> all undeveloped areas in and within 100 feet of <br /> development and staging areas.Potential dens <br /> shall be monitored to determine if they are active, <br /> in accordance with methods presented in the <br /> K Standardized Recommendations for Protection of <br /> co the San Joaquin Kit Fox Before or During Ground <br /> o Disturbance(USFWS 1999). <br /> < If no active dens are found during the surveys,a <br /> letter report documenting the survey methodology <br /> c and findings shall be submitted to USFWS and <br /> DFG within 5 days after survey completion and <br /> before the start of ground disturbance or <br /> CL construction activity,and no further mitigation <br /> m shall be necessary. <br /> $ < Any known or potential dens discovered within <br /> the survey area shall be monitored for 3 days to <br /> determine its current use.If no activity is observe <br /> my during this period,the den shall be destroyed <br /> y immediately to preclude subsequent use.If kit fox <br /> activity is observed,the den shall be monitored tot <br />