Laserfiche WebLink
Km <br /> 0 <br /> D <br /> ° College Park at Mountain House Specific Plan III <br /> o' <br /> = Mitigation Monitoring and Reporting Program <br /> o Implementation&Verification <br /> o Mitigation Measure Timing/Schedule Implementation p Date <br /> �. Responsibility Action <br /> Completed <br /> nat least 5 consecutive days from the time of the <br /> observation,to allow any kit fox occupying the <br /> den to move to another location. If it is not a natal <br /> ;L or pupping den,use of the den can be discouraged <br /> uuilug iuiu perlvu by pdt'unuy Yiu55+i'5 au <br /> v entrance(s)with soil in such a manner that any <br /> animal can escape easily.The den may be <br /> 3 destroyed when,in the judgment of a qualified <br /> biologist,it is no longer occupied by a kit fox or it <br /> is temporarily vacant.Methods for den destruction <br /> shall be in accordance with USFWS <br /> recommendations. <br /> wo < Occupied natal or pupping dens shall not be <br /> destroyed until the adults and pups have vacated <br /> the den and then only after consultation with <br /> USFWS.A 250-foot buffer zone shall be <br /> o maintained around natal dens until the biologist <br /> determines that the den has been vacated. <br /> Additional provisions of the Standardized <br /> m Recommendations for Protection of the San <br /> 'Z- Joaquin Kit Fox Before or During Ground <br /> � Disturbance(USFWS 1999),including those <br /> 0 for educating construction workers regarding <br /> kit fox,keeping heavy equipment operating at <br /> safe speeds,and checking construction pipes <br /> o for kit fox occupation during construction, <br /> shall also be implemented. <br /> 0 Jurisdictional Waters of the United States Before Construction SJCOG,in <br /> < The College Park Developers shall implement coordination with <br /> Mitigation Measure 4.10-10. DFG,USACE and/or <br /> oRWQCB <br /> 4.11. TRAFFIC <br /> 4.11-1 Transportation—Effects on 2025 Cumulative Before construction San Joaquin County <br />