Laserfiche WebLink
4 <br /> ENVIRONMENTAL CHECKLIST <br /> This chapter of the Checklist includes a discussion of existing environmental conditions at <br /> the site,potential environmental impacts resulting from implementation of the proposed <br /> ` project, and applicable mitigation measures,if any. The Environmental Checklist covers <br /> specific issues by topic (i.e., Aesthetics, Geology, Land Use, etc.). Each topic includes the <br /> following four sections: (1) Setting; (2) Significant Impacts Identified in the 2005 SPIIIEIR; <br /> ` (3)Mitigation Measures of the 2005 SPIIIEIR Relevant to the Project; and(4)Discussion <br /> Regarding the Proposed Project. The Checklist questions are shown with a solid box <br /> %W denoting the potential level of impact. Under the Discussion,if new impacts are identified, <br /> they are followed by mitigation measures that are labeled and numbered. Mitigation <br /> `' measures that were adopted by the Mountain House Master Plan Final EIR (MEIR)and <br /> %W College Park at Mountain House Specific Plan III Final EIR (SPIIIEIR)are identified along <br /> V with any additional required mitigations based on the current analysis in this Checklist. The <br /> criteria for significance are also identified,when applicable. <br /> 4 <br /> Since this Checklist relies on the SPIIIEIR,the standard Checklist has been modified to <br /> address the consistency between the environmental evaluation prepared for Specific Plan III <br /> and the environmental evaluation for the proposed project. The five Checklist categories <br /> %W include: (1)Less Than Significant or No Impact,(2)Potentially Significant Impact <br /> ` Adequately Addressed in SPIIIEIR; (3) Less Than Significant Impact Due to Mitigation <br /> Measures in Project Description; (4)New Additional Impact Not Addressed in SPIIIEIR; and <br /> (5)New Additional Mitigation Measures Required. <br /> The "Discussion" follows the checked boxes so that the reader is informed as to why a <br /> specific box of the Checklist was marked. The discussions identify earlier analyses, the <br /> source of the information for the conclusion reached,and mitigation measures either already <br /> required for the project or suggested as part of the current analysis to reduce impacts to a <br /> less-than-significant level. <br /> The proposed project has been analyzed under each component of the Checklist. It has been <br /> determined that the proposed project presents no substantial changes with respect to the <br /> circumstances under which the SPIIIEIR was certified. There are no impacts associated with <br /> the proposed project that were not previously assessed in the SPIIIEIIL There is no new <br /> �r available information,which was not known at the time the SPIIIEIR was certified, that <br /> V requires major revisions of the document. Thus,no additional environmental documentation <br /> is required. <br /> 4 <br /> b <br /> `. MOUNTAIN HOUSE PROPOSED MACHADO 1trrAnvE Mar 8/9/06 4-1 <br /> `r <br />