Laserfiche WebLink
MOUNTAIN HOUSE PROPOS®MAcxnoo TENTATIVE MAP 4. ENviEoNMENTAL CHECKusT -� <br /> 4.10 MINERAL RESOURCES <br /> i <br /> b) Result in the loss of availability of a locally-important mineral resource recovery site <br /> delineated on a local general plan, specific plan or other land use plan? <br /> Since there are no known mineral resources on the Machado property,the proposed project <br /> would have no impact on the availability of locally-important mineral recovery sites <br /> delineated in the San Joaquin County General Plan. <br /> Mitigation Measures <br /> No mitigation measures are required. <br /> Conclusions <br /> The proposed project presents no substantial changes with respect to the circumstances under <br /> which the SPI1IEkR was certified. There are no significant mineral resource impacts <br /> associated with the proposed project that were not previously examined in the MEIR or the <br /> SPIIIEIR. <br /> SOURCES OF INFORMATION _ <br /> EDAW. 2005. Final Environmental Impact Report, College Park at Mountain House, <br /> Specific Plan III, Volume III, SCH#2003101074,June 24. <br /> San Joaquin County. 1992. General Plan 2010(Volumes I-III). Adopted July 29,as <br /> amended. <br /> 4-54 <br />