My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006226
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOUNTAIN HOUSE
>
22261
>
2600 - Land Use Program
>
PA-0600161
>
SU0006226
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2019 2:19:14 PM
Creation date
9/6/2019 10:18:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006226
PE
2611
FACILITY_NAME
PA-0600161
STREET_NUMBER
22261
Direction
S
STREET_NAME
MOUNTAIN HOUSE
STREET_TYPE
PKWY
City
MOUNTAIN HOUSE
ENTERED_DATE
8/29/2006 12:00:00 AM
SITE_LOCATION
22261 S MOUNTAIN HOUSE PKWY
RECEIVED_DATE
8/28/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\M\MOUNTAIN HOUSE PKWY\22261\PA-0600161\SU0006226\MISC.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
996
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOUNTAIN HOUSE PROPOSED MACHADO TENTATIVE MAP 4. DN ONmElNTAL CHEcxrrsT J <br /> 4.13 PUBLIC SERVICES <br /> J <br /> The County Sheriff has an office in the new fire station located at Mascot Boulevard and <br /> Tradition Street. A new sheriff s substation in the Mountain House Town Center,located in <br /> Specific Plan I area,will be constructed before the total population of Mountain House _ <br /> Community reaches 7,500 people. The Mountain House Community is in Beat Area 8,and the <br /> current average response time is less than 20 minutes from the time the dispatch call is issued to <br /> the time the officers are on the scene at the Mountain House Community(EDAW 2005b). The <br /> average response time will be significantly reduced when the substation is operational at the <br /> Mountain House Community. Therefore,the proposed project would result in a less-than- <br /> significant impact on law-enforcement services for the Mountain House Community. <br /> Mitigation Measures " <br /> No mitigation measures are required. <br /> Schools? <br /> As shown in Table 4.13-1,the proposed project would generate demand for school services <br /> and facilities because 193 K-8 and 51 high school students are projected to be living in the <br /> proposed project at buildout. <br /> Table 4.13-1 <br /> Student Generation <br /> J <br /> Grade Level Proposed Dwelling Units Student Generation Rate Total <br /> K-8 286° 0.676 per dwelling unit° 193 <br /> High School . 286' 0.179 per dwelling units 51 <br /> Notes: 'Excluding secondary dwelling units that would accommodate only one adult resident each. <br /> n EDAW,2005a. <br /> LESD is currently operating the Wicklund Elementary School which has an available <br /> capacity for 216 additional students. LESD believes this school will be at capacity within <br /> two years. LESD plans to construct and operate two new K-8 schools,one each in _ <br /> Neighborhoods E and G in the Specific Plan I area,each with a capacity for 850 students. <br /> The new school in Neighborhood E is anticipated to be operating in 2006. The proposed " <br /> project includes a K-8 school site at the southwest comer of the project site. LESD would - <br /> determine when this school would be built. Until this K-8 school is constructed, students <br /> from the proposed project would be bussed(or driven)to the operating K-8 schools in the <br /> Specific Plan I area(EDAW, 2005b). <br /> A new high school (to be named Mountain House High School)would be constructed at the <br /> southeast comer of Central Parkway and Mascot Boulevard as required by the MHMP. <br /> Mountain House High School will have a final capacity for 2,400 students and will be built in <br /> phases to accommodate growing student population from the ongoing residential <br /> development at the Mountain House Community, including the proposed project. The first <br /> phase of Mountain House High School is planned to accommodate 650 students. The Tracy <br /> Unified School District(TUSD)would staff and operate the high school and will determine <br /> when the school will be constructed. <br /> 4-68 <br />
The URL can be used to link to this page
Your browser does not support the video tag.