Laserfiche WebLink
K m <br /> O <br /> c n <br /> o College Park at Mountain House Specific Plan HI <br /> Mitigation Monitoring and Reporting Program <br /> Mitigation Measure Timing/Schedule Implementation <br /> Implementation&Verification <br /> Responsibility Date <br /> Action Completed <br /> n during the nesting season(February 15–August <br /> 31),pre-construction surveys shall be conducted <br /> during the nesting season in suitable nesting <br /> ?. habitat within 500 feet of areas of project <br /> activity.The survey shall be conducted within <br /> 0 <br /> the 2 weeks before construction or tree removal <br /> begins.If any active nests are found,a setback of <br /> 3 200 feet from each nest shall be established and <br /> maintained during the nesting season for the <br /> period encompassing nest building and <br /> continuing until fledglings leave nests.This <br /> setback applies whenever construction or other <br /> No ground-disturbing activities must begin during <br /> the nesting season in the presence of nests that <br /> are known to be occupied.Setbacks shall be <br /> marked by brightly colored temporary fencing. <br /> 0 4.10-7 Biological Resources—Conversion of Other Before construction SJCOG,in <br /> Special-Status Nesting Bird Habitat and Possible (surveys shall be consultation with DFG <br /> v Loss of Active Nests conducted 2 weeks <br /> The College Park developers shall request coverage prior to construction <br /> under the SJMSCP,and fees shall be paid in the activities) <br /> amount determined by SJCOG during the application <br /> and review process for each project under College <br /> Park.During the SJMSCP application process, <br /> SJCOG will determine whether that specific project <br /> my site supports suitable habitat for loggerhead shrike, <br /> CD California homed lark,or tricolored blackbird. If <br /> o` o SJCOG determines suitable habitat is present on or <br /> nCD <br /> adjacent to a given project site,the following <br /> C. <br /> SJMSCP incidental take avoidance and minimization <br /> o measures shall be implemented by the project <br /> > > applicants in consultation with a qualified biologist. <br /> < Loggerhead Shrike.If project construction <br />