Laserfiche WebLink
W 0 <br /> N O <br /> 0 (0 <br /> College Park at Mountain House Specific Plan III <br /> Mitigation Monitoring and Reporting Program <br /> o Implementation <br /> Implementation&Verification <br /> c Mitigation Measure Timing/ScheduleDate <br /> Responsibility Action Completed <br /> �• conducted to investigate all potential nesting <br /> o trees on the project site(e.g.,especially tree-tops <br /> y 15-59 feet above the ground in oak,willow, <br /> 'D eucalyptus,cottonwood,or other deciduous <br /> Cn <br /> trees),whenever white-tailed kites are noted on- <br /> CD site or within the vicinity of the site during the <br /> nesting season.A setback of 100 feet from white- <br /> tailed kite nesting areas shall be established and <br /> maintained during the nesting season for the <br /> period encompassing nest building and <br /> continuing until fledglings leave nests.This <br /> setback applies whenever construction or other <br /> ground-disturbing activities must begin during <br /> the nesting season in the presence of nests that <br /> are known to be occupied.Setbacks shall be <br /> marked by brightly colored temporary fencing. <br /> < Northern Harrier.If project construction begins <br /> during the nesting season(February 15—August <br /> o 31),pre-construction surveys shall be conducted <br /> = during the nesting season in suitable nesting <br /> habitat within 500 feet of areas of project <br /> o activity.The survey shall be conducted within <br /> the 2 weeks before construction begins.A <br /> setback of 500 feet from northern harrier nesting <br /> areas shall be established and maintained during <br /> athe nesting season for the period encompassing <br /> nest building and continuing until fledglings <br /> o leave nests.This setback applies whenever <br /> construction or other ground-disturbing activities <br /> must begin during the nesting season in the <br /> -0 presence of nests that are known to be occupied. <br /> o m P P�ed. <br /> o Setbacks shall be marked by brightly colored <br /> temporary fencing. <br /> < Common Raptors.If project construction begins <br />