Laserfiche WebLink
KLEINFE LD ER <br /> 6. storage tanks located onsite and that three AST's, located along the northeastern bank of the <br /> central irrigation canal, are used for fueling vehicles. To the best of his knowledge, one tank is a <br /> 100-gallon gasoline tank and the other two are 550-gallon diesel fuel tanks. <br /> L <br /> L 7.2. INTERVIEW WITH OCCUPANTS <br /> Mr. Spatafore is the site owner and occupant. <br /> L <br /> 7.3. INTERVIEW WITH CLIENT/OTHERS <br /> A brief phone conversation was held with Mr. Larry Whitehead (Chevron) on October 24, 2002, <br /> regarding an underground petroleum pipeline located onsite. According to Mr. Whitehead, a <br /> L product pipeline runs through the southwestern portion of the site. To the best of his knowledge, <br /> the pipeline is an 18-inch crude oil pipeline. Mr. Whitehead stated that there were no reported <br /> incidents involving ruptures or leakage for the pipeline. Mr. Whitehead also stated that there are <br /> Ltwo Pacific Gas and Electric (PG &E) natural gas pipelines trending through the site. <br /> L <br /> L <br /> L <br /> L <br /> L <br /> L <br /> L <br /> L <br /> L <br /> L21073.P01 /ST02R761 Page 24 of 31 <br /> Copyright 2002 Kleinfelder,Inc. November 12,2002 <br /> L <br />