My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004320
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOUNTAIN HOUSE
>
24383
>
2600 - Land Use Program
>
PA-0200393
>
SU0004320
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2019 3:34:51 PM
Creation date
9/6/2019 10:19:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004320
PE
2632
FACILITY_NAME
PA-0200393
STREET_NUMBER
24383
Direction
S
STREET_NAME
MOUNTAIN HOUSE
STREET_TYPE
PKWY
City
TRACY
ENTERED_DATE
5/17/2004 12:00:00 AM
SITE_LOCATION
24383 S MOUNTAIN HOUSE PKWY
RECEIVED_DATE
9/6/2002 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\M\MOUNTAIN HOUSE PKWY\24383\PA-0200393\SU0004320\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONDITIONS OF APPROVAL <br /> PA-02-393 <br /> Christy Concrete Products <br /> Site Approval Application No. PA-02-393 was approved by the San Joaquin County Community <br /> Development Department on November 1, 2002. The effective date of approval is November 11, <br /> 2002. This approval will expire on May 12, 2004, which is 18 months from the effective date of <br /> approval, unless (1) all Conditions of Approval have been complied with, (2) all necessary building <br /> permits have been secured and remain in force, and (3) all necessary permits from other agencies <br /> have been secured and remain in force. <br /> Unless otherwise specified, all Conditions of Approval and Ordinance requirements shall be fulfilled <br /> prior to the establishment of the use and the issuance of any building permits. Those Conditions <br /> followed by a Section Number have been identified as Ordinance requirements pertinent to this <br /> application. Ordinance requirements cannot be modified, and other Ordinance requirements may <br /> apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT(Staff Contact: Jennifer Jolley, 468-3161) <br /> a. BUILDING PERMIT: Submit an "APPLICATION-COMMERCIAL BUILDING PERMIT'. The Site <br /> Plan required as a part of the building permit must be prepared by a registered civil engineer or <br /> licensed architect. This Plan must show drainage, driveway access details (including gates), on-site <br /> parking, landscaping, signs, existing and proposed utility services, and grading (refer to the "SITE <br /> PLAN CHECK LIST' for details). A fee is required for the Site Plan review. (Development Title <br /> Section 9-884) <br /> b. APPROVED USE: This approval is for construction of a 90-foot-high monopole and accessory <br /> equipment and antennas. (Use Type: Communication Services-Type 11) <br /> c. SETBACKS: The structure shall comply with the following setback requirements: <br /> (1) The proposed tower and accompanying equipment shelter shall be set back a minimum of thirty <br /> (30)feet from the front and rear property line. (Development Title Section 9-610.5). <br /> (2) New freestanding support structures shall be located a distance equal to at least the height of <br /> the said structure from residential structures on adjoining properties. (Development Title Section <br /> 9-1065.4[d[) <br /> d. MAINTENANCE OF FACILITIES: All freestanding structures, antennas, and supporting equipment <br /> associated with wireless telecommunication shall be maintained in good condition by the provider of <br /> the telecommunication facility and, whenever necessary, repaired or replaced. (Development Title <br /> Section 9-1065.7) <br /> e. REMOVAL OF FACILITIES: Freestanding structures, antennas, and supporting equipment <br /> associated with wireless telecommunication shall be removed by the provider of such facilities and <br /> the site restored to its pre-construction state if said facilities have not been operational or used for a <br /> period of six (6) consecutive months. Removal and site restoration shall be completed within ninety <br /> (90)days of the end of said six(6)month period. (Development Title Section 9-1065.8) <br /> Conditions of Approval - 1 - PA-02-393 <br />
The URL can be used to link to this page
Your browser does not support the video tag.