Laserfiche WebLink
J <br /> ov!H A <br /> ar zs P.O.BOX 1810-1810 E.HAZELTON AVENUE <br /> _ THOMAS R. FLINN STOCKTON,CALIFORNIA 95201 <br /> DIRECTOR (209)468-3000 FAX(209)468-2999 <br /> • IFoie ia�tr. WWW,SJJOY.Qr91pubwork& <br /> THOMAS M.GAU <br /> CHIEF DEPUTY DIRECTOR <br /> MICHAEL SELLING Worldn for YOU <br /> DEPUTY DIRECTOR <br /> STEVEN WINKLER <br /> DEPUTY DIRECTOR <br /> ROGERJANES <br /> BUSINESS ADMINISTRATOR <br /> REGI EVED <br /> 112010 <br /> February 10, 2010 Gommunity Development Dept. <br /> MEMORANDUM <br /> TO: Rick Griffin, Senior PIanner <br /> Community Development Department <br /> CONTACT PERSON: Kevin Swanson - <br /> FROM: Bill DuBois,Engineer III LL <br /> Public Services Division <br /> SUBJECT: PA-1000008;A Minor Subdivision application to subdivide two parcels totaling approximately <br /> 219 acres into three parcels and a designated remainder. Parcel one to contain 25.4 acres,parcel <br /> two to contain 35.2 acres parcel three to contain 46.0 acres and a designated remainder to <br /> � p � <br /> contain 112.4 acres, located on the east side of Jack Tone Road, 513 feet south of Live Oak <br /> Road. (Supervisorial District 4) <br /> PROPERTY OWNER: John A.Fugazi,Etal r APPLICANT: Dillon&Murphy r <br /> ADDRESS: 10850 N. Jack Tone Road APN: 065-060-02 &03 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration Designated Flood Hazard Area. <br /> f -- <br /> y a <br /> Jack Tone Road has an existing right-of-way width of 80 feet and a planned right-of-way width of 84 feet. <br /> Live Oak Road has an existing variable-width right-of-way(20 feet south of the centerline)and a planned right- <br /> of-way width of 50 feet.. <br /> The Traffic Impact Mitigation Fee shall be required when parcels are developed. The fee is due and payable at <br /> the time of building permit application. <br /> The Regional Transportation Impact Fee will be required when parcels are developed. The fee is due and payable <br /> at the time of building permit application. <br /> The Water Supply Facilities Impact Mitigation Fee shall be required when parcels are developed. The fee is due <br /> and payable at the time of building permit application- <br /> , <br />