Laserfiche WebLink
The typical repair is add 40 foot one leach line and one 25 foot pit. This repair appears to be <br /> common all over SJC. The higher ground has more rapid surface drainage than the lower areas in <br /> Parcels 1-3. Parcel 4 is flat. The drainage to the west thru a culvert on Jack Tone Road has been <br /> reduced by downstream owners moving and tilling the soil. The leach fields for Parcel 1 and <br /> Parcel l are on higher ground away from the lower elevation levels. The terrain for Parcel 3 <br /> slopes higher to the south and to the east. Standard systems are expected to support single family <br /> residences but not multiple residences. The lots are large enough to construct a system for each <br /> residence. <br /> GROUNDWATER INFORMATION SECTION <br /> The water testing lab(FarWest Labs,Inc.)Does not have a chain of custody. They sample and <br /> test. No third party was involved in the water sampling/testing. <br /> SOIL PROFILE INFORMATION SECTION <br /> No pits were excavated on the parcels. All soil classification is made during the drilling process. <br /> Pits to 25 feet are required. <br /> PERCOLATION TEST INFORMATION SECTION <br /> The testing conformed to SIC Policy EHD 02-02. Forms provided by the EHD were used. <br /> CONCLUSION SECTION <br /> The 10 acre lots provide enough area for the leach fields and adequate future expansion area. <br /> 3. <br />