My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004416 SSNL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
4799
>
2600 - Land Use Program
>
SA-01-74
>
SU0004416 SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:30:47 AM
Creation date
9/6/2019 10:26:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU0004416
PE
2632
FACILITY_NAME
SA-01-74
STREET_NUMBER
4799
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
STOCKTON
APN
08917051
ENTERED_DATE
5/19/2004 12:00:00 AM
SITE_LOCATION
4799 N JACK TONE RD
RECEIVED_DATE
9/20/2001 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\J\JACK TONE\4799\SA-01-74\SU0004416\NL STDY.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
February 25, 2002 <br /> Job Number:LGOl-397 <br /> Page 12 <br /> Table 7. <br /> Total Estimated Septic Effluent. <br /> (see worksheets in Appendix for calculations) <br /> Category Quantity People Annual Effluent Qua]da365 <br /> *Regular Staff 15 IS 15 gallons/day/person x IS people x(Ss)x 365= l(a� <br /> (Mon-Fri) gallons/day/person 58,661 gallons/year <br /> **Temporary 15 200 15 gallons/day/person x 200 people x 10days/week <br /> weeks 1-10 gallons/day/person =210,000 gallons/ye <br /> **Temporary 15 200 15 gallons/day/person x 200 people x 5days/weekweeks 3-8 gallons/day/person = 105,000 gallons/y**Temporary 15 200 15 gallons/day/person x 200 people x 2days/weekweeks 5-6 gallons/day/person =42,000 gallons/yeTotal average annual effluent quantity: 58,661 +210,000+ 105,000 415,661 gallons/year(1,573,277 )*** <br /> ` * Regular staff works Monday thru Friday,multiply by 5/7 to adjust for 7 day week. <br /> ** Temporary workers during a 10-week cherry processing period generally between May-July each year. <br /> ***To find liters,multiply gallons by 3.785. <br /> It is estimated that septic waste water flow in an average year is about 415,661 gallons <br /> per year or 1,573,277 liters per year. <br /> Nitrogen from Fruit Packing Process Waste Water <br /> ` Waste water generated from Chinchiolo Fruit Company and apple production from Sierra <br /> Hills Packing Inc. is disposed into a waste water detention pond located along the western <br /> ` portion of both sites. Water is used to float the fruit along a process line. A flow meter was <br /> installed in a sump and measures wastewater into the pond from both facilities. The flow was <br /> monitored periodically between March 1, 2001 and January 3, 2002. The flow for a 308 day <br /> period was 23,568,360 gallons. Corrected for an 365 day year,the flow projection is 24,547,434 <br /> gallons per year(365/308 x 23,568,360=27,547,434 gallons/year). We understand that the flow <br /> meter may have received some back flow and the actual flow may be much higher. Therefore, an <br /> ►- assum made that 27 547,434 allons/ ear is robabl oate and under_at gr <br /> actual flow. Recently,the meter has been repositioned to prevent backflow and monitoring <br /> n ues. <br /> pFIyOM1 <br /> ` 0�4 <br /> 110 <br />
The URL can be used to link to this page
Your browser does not support the video tag.