Laserfiche WebLink
AT&T will immediately inform you of our findings should we encounter the system <br /> within our foundation or caisson excavation. Should we impact the septic system, we will <br /> immediately replace and mitigate same to your satisfaction. It appears there is sufficient <br /> expansion area to the West of our site consisting of approximately 2,660sgft., 14' wide <br /> by 190' long. (hopefully this takes into account all your setback requirements) <br /> Sincerely, <br /> Its: Site Ac uisition Consultant <br /> Note: Ted; <br /> One possible scenario may be that, say 10' of leach line is covered or <br /> blocked off, we could install a D box prior to the impact, run tight-line <br /> through the affected area to the remaining system, and install an <br /> alternate pit in the expansion area via tight-line from the new D-box, <br /> (outflow set to handle overflow only), of a size that you would <br /> determine. <br />