Laserfiche WebLink
PAGE 2 <br /> CONSTRUCTION SCHEDULE AND USAGE ARE AS FOLLOWS; REFER TO APPENDIX <br /> "D"FOR THE PROJECT'S LISTING&PROPOSED LAYOUT. <br /> PROJECT PHASE YEAR USAGE SQ.FT. <br /> B1 I 2013 BOTTLING BLDG 300, 000 <br /> Ll I 2013 PARKING LOT AREA 104, 092 <br /> Tl I 2013 BOTTLING TANKS BLDG 16, 000 <br /> W1 I 2013 WAREHOUSE BLDG 600,000 <br /> Al I 2015 ADMIN BLDG 5, 000 <br /> A2 I 2018 ADMIN BLDG 3, 000 <br /> T2 I 2018 TANK AREA 163, 400 <br /> P1 I 2020 PRESS BLDG 36, 750 <br /> T3 I 2020 TANK AREA 90,125 <br /> T4 II 2022 TANK AREA 375,550 <br /> B2 II 2025 BOTTLING BLDG 300, 000 <br /> T5 I1 2025 TANK AREA 308, 250 <br /> W2 II 2025 WAREHOUSE BLDG 600,000 <br /> G <br /> FACILITY'S OPERATION; PLEASE NOTE THE FOLLOWING. <br /> 1. PRODUCTION SCHEDULE IS AS FOLLOWS; <br /> HARVEST SCHEDULE IS BETWEEN AUGUST 15 TO OCTOBER 31. <br /> NON-HARVEST SCHEDULE IS BETWEEN NOVEMBER I TO AUGUST 14. <br /> 2. TRUCK TRAFFIC IS ESTIMATED AS FOLLOWS; <br /> PRESENT PERMITTED WINERY CAPACITY TO BE NET IN 2014. <br /> HARVEST SCHEDULE; MAX(80)TRUCKS PER DAY. <br /> NON-HARVEST SCHEDULE; MAX(27)TRUCKS PER DAY. <br /> PHASE I; <br /> HARVEST SCHEDULE; MAX(345)TRUCKS PER DAY. <br /> NON-HARVEST SCHEDULE; MAX(195)TRUCKS PER DAY. <br /> PHASE I1; <br /> HARVEST SCHEDULE; MAX(410)TRUCKS PER DAY. <br /> NON-HARVEST SCHEDULE; MAX(260)TRUCKS PER DAY. <br /> 3. HOURS OF EMPLOYEES&OPERATIONS ARE ESTIMATED AS FOLLOWS; <br /> HARVEST SCHEDULE; 24 HOURS/DAY,MONDAY THRU SATURDAY. <br /> WINERY OPERATIONS; <br /> 1st SHIFT: 6AM — 6PM 130 EMPLOYEES <br /> 2nd SHIFT: 6PM — 6AM 90 EMPLOYEES <br /> BOTTLING OPERRATIONS; <br /> 1st SHIFT: 6AM - 2PM 128 EMPLOYEES <br /> 2nd SHIFT: 2PM - IOPM 116 EMPLOYEES <br /> 3rd SHIFT: lOPM - 6AM 116 EMPLOYEES <br /> WAREHOUSE OPERATIONS; <br /> 1st SHIFT: 7AM - 3PM 44 EMPLOYEES <br /> 2nd SHIFT: 3PM - 11PM 34 EMPLOYEES <br />