Laserfiche WebLink
Engineering Construction Cost Index as published by the Engineering News Record. <br /> (Resolutions R-00-433) <br /> c.The Regional Transportation Impact Fee shall be required for this development. The fee is due and <br /> payable at the time of building permit application. The fee will be based on the current schedule <br /> at the time of payment. (Resolution R-06-38) <br /> d. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> e. Prior to issuance of any Certificate of Occupancy for Phase I, applicant shall add a stop sign and <br /> a painted stop bar to the project access approach (eastbound) to Jacob Brack Road at a location <br /> far enough back from Jacob Brack Road to ensure that the northbound left-turning and opposing <br /> eastbound right-turning vehicles don't conflict or collide. <br /> f. Verification shall be obtained from the Solid Waste Division (468-3066)that this development has <br /> met the requirements of the Waste Plan Format for Development Projects. Final Site Plan is <br /> required upon submittal of verification. <br /> g. Applicant shall file ail Permit Registration Documents (PRDs) with the State Water Resources <br /> Control Board (SWRCB) to state the intent to comply with the State "General Permit for Storm <br /> Water Discharges Associated with Construction Activity". The Waste Discharge Identification <br /> Number(WDID) issued by SWRCB, shall be submitted to Public Works for file. <br /> h. The project site is located in a flood fringe area. Prior to release of building permit(s): <br /> (1) Technical data shall be submitted to the Department of Public Works to determine that the <br /> cumulative effect of the proposed development, when combined with all other existing and <br /> anticipated development, will not increase the water surface elevation of the one-hundred <br /> (100) year flood more than one (1)foot at any given point. (Development Title Section 9- <br /> 1605.6 (a)) <br /> (2) Plans shall be submitted to the Department of Public Works to show that all new construction <br /> and substantial improvements of existing structures are anchored to prevent flotation, <br /> collapse, or lateral movement of the structure resulting from hydrodynamic and hydrostatic <br /> loads, including the effects of buoyancy. (Development Title Section 9-1605.10) <br /> (3) For inquiries regarding the requirements listed above, please contact the Flood Management <br /> Division of the Department of Public Works (209-468-7612). <br /> Informational Notes: <br /> This property is subject to the requirements of San Joaquin County Mosquito &Vector Control District <br /> (209-982-4675) and the California Health and Safety Code for the prevention of mosquitoes. Best <br /> Management Practices (BMP)guidelines for stormwater devices, ponds and wetlands are available. <br /> All future building permits for projects located within a special flood hazard area at the time of permit <br /> issuance shall meet the San Joaquin County flood hazard reduction requirements (Title 9, Chapter 9- <br /> 1605) and all requirements of the State of California (CCR Title 23)that are in force at the time of permit <br /> issuance. As an example, these requirements may include raising the finish floor elevation one foot <br /> above the expected flood level and/or using flood resistant materials. <br /> Conditions of Approval - 3 - PA-1100024 <br />