My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002249
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACOB BRACK
>
18667
>
2600 - Land Use Program
>
UP-98-08
>
SU0002249
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:29:08 AM
Creation date
9/6/2019 10:28:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0002249
PE
2626
FACILITY_NAME
UP-98-08
STREET_NUMBER
18667
STREET_NAME
JACOB BRACK
STREET_TYPE
RD
City
LODI
APN
01115012
ENTERED_DATE
10/26/2001 12:00:00 AM
SITE_LOCATION
18667 JACOB BRACK RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\J\JACOB BRACK\18667\UP-98-08\SU0002249\APPL.PDF \MIGRATIONS\J\JACOB BRACK\18667\UP-98-08\SU0002249\CDD OK.PDF \MIGRATIONS\J\JACOB BRACK\18667\UP-98-08\SU0002249\EH COND.PDF \MIGRATIONS\J\JACOB BRACK\18667\UP-98-08\SU0002249\EH PERM.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
378
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SUTTER HOME WINERY <br /> i - (Please Reference the Use Permit Application and Site Plan) <br /> PROJECT DESCRIPTION <br /> The project at total build-out is a bulk wine producing facility that will consist of the <br /> following unit operations: <br /> Grape receiving including weighing, inspecting and dumping <br /> g <br /> Grape crushing and pressing <br /> Fermentation <br /> Filtering and finishing <br /> In process and final storage <br /> This facility will also receive bulk wine from other suppliers for finishing and storage <br /> however;this project does not have any bottling or distribution of bottled product. <br /> E Along with the unit processes are the support functions necessary to operate the site <br /> including refrigeration, electrical distribution, storm water retention,process wastewater <br /> ponds with spray irrigation disposal, a well for the water supply to the site and a septic <br /> F <br /> system and leach field for sanitary disposal. <br /> Additionally there will be a small office building and a maintenance building. <br /> 4 PHASE IA <br /> r <br /> This is the primary phase of the overall project including all the basic infrastructure items <br /> such as the office,roads,wastewater ponds, drainage, water supply, main electrical, etc. <br /> k The aforementioned will be installed in whole or in part. Additionally,the crosshatched <br />± areas on phase IA, sheets 1 & 2 will be constructed during this time. This phase will start <br /> as soon as permits can be approved and will be complete by July 01, 1999. <br /> E <br />`F PHASE IB <br /> f <br /> i <br /> Refer to the crosshatched areas on drawings labeled Phase IB, sheets 1 & 2. In addition <br /> fto the obvious increase in tank construction there will be increases in the refrigeration <br /> system, filtering equipment and grape dump &crush equipment. This activity will run <br /> from 07/01/99 until 07101100. <br /> 1 <br /> t <br />
The URL can be used to link to this page
Your browser does not support the video tag.