My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002249
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACOB BRACK
>
18667
>
2600 - Land Use Program
>
UP-98-08
>
SU0002249
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:29:08 AM
Creation date
9/6/2019 10:28:06 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0002249
PE
2626
FACILITY_NAME
UP-98-08
STREET_NUMBER
18667
STREET_NAME
JACOB BRACK
STREET_TYPE
RD
City
LODI
APN
01115012
ENTERED_DATE
10/26/2001 12:00:00 AM
SITE_LOCATION
18667 JACOB BRACK RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\J\JACOB BRACK\18667\UP-98-08\SU0002249\APPL.PDF \MIGRATIONS\J\JACOB BRACK\18667\UP-98-08\SU0002249\CDD OK.PDF \MIGRATIONS\J\JACOB BRACK\18667\UP-98-08\SU0002249\EH COND.PDF \MIGRATIONS\J\JACOB BRACK\18667\UP-98-08\SU0002249\EH PERM.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
378
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PHASE IC <br /> Refer to the crosshatched area on the attached drawings labeled Phase IC, sheets 1 & 2. <br /> During this phase additional storage and fermenters are added along with completion of <br /> all infrastructure items to support the build-out. This activity will run from 07/01/00 until <br /> 07101101. <br /> PHASE IIA <br /> Refer to the crosshatched area on the attached drawings labeled Phase IIA, sheets 1 & 2. <br /> This is the major activity in phase II and includes additional tanks for storage and <br /> fermentation, additional presses,the external maintenance building, increased truck <br /> staging,expanded filtration area and all infrastructure increases as required. This activity <br /> will run from 07/01/02 until 07/01/03. <br /> PHASE IIB <br /> I <br /> Refer to the crosshatched area on the attached drawings labeled Phase TIB, sheets 1 &2. <br /> This sub-phase includes more storage, increased refrigeration and increased pressing <br /> iI capability. This activity will run from 07/01/03 until 07/01/04. <br /> I <br /> PHASE HC <br /> Refer to the crosshatched area on the attached drawings labeled Phase IIC, sheets 1 & 2. <br /> This sub-phase completes the build-out of the facility as shown on the overall Site Plan. <br /> This activity will run from 07/01/04 until 07/01/05. <br /> f <br /> PARKING <br /> I <br /> The parking spaces for the total build-out are shown on the Site Plan. Thirty-four(34) of <br /> the thirty-nine (39) spaces will be built during phase IA. The remaining five (5) spaces <br /> will be added by the maintenance building when constructed in phase IIA. The space <br /> total includes one space for every employee even though they are distributed across <br /> various shifts. This gives more spaces than that required by the guidelines set in the <br /> Parking and Loading Manual. <br /> k <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.