Laserfiche WebLink
PHASE IC <br /> Refer to the crosshatched area on the attached drawings labeled Phase IC, sheets 1 & 2. <br /> During this phase additional storage and fermenters are added along with completion of <br /> all infrastructure items to support the build-out. This activity will run from 07/01/00 until <br /> 07101101. <br /> PHASE IIA <br /> Refer to the crosshatched area on the attached drawings labeled Phase IIA, sheets 1 & 2. <br /> This is the major activity in phase II and includes additional tanks for storage and <br /> fermentation, additional presses,the external maintenance building, increased truck <br /> staging,expanded filtration area and all infrastructure increases as required. This activity <br /> will run from 07/01/02 until 07/01/03. <br /> PHASE IIB <br /> I <br /> Refer to the crosshatched area on the attached drawings labeled Phase TIB, sheets 1 &2. <br /> This sub-phase includes more storage, increased refrigeration and increased pressing <br /> iI capability. This activity will run from 07/01/03 until 07/01/04. <br /> I <br /> PHASE HC <br /> Refer to the crosshatched area on the attached drawings labeled Phase IIC, sheets 1 & 2. <br /> This sub-phase completes the build-out of the facility as shown on the overall Site Plan. <br /> This activity will run from 07/01/04 until 07/01/05. <br /> f <br /> PARKING <br /> I <br /> The parking spaces for the total build-out are shown on the Site Plan. Thirty-four(34) of <br /> the thirty-nine (39) spaces will be built during phase IA. The remaining five (5) spaces <br /> will be added by the maintenance building when constructed in phase IIA. The space <br /> total includes one space for every employee even though they are distributed across <br /> various shifts. This gives more spaces than that required by the guidelines set in the <br /> Parking and Loading Manual. <br /> k <br /> 2 <br />