Laserfiche WebLink
i <br /> SUMMIT ENGINEERING,INC. SUTTER HOME PROJECT NO. 2001015 <br /># Consulting Civil Engineers Pond Water Balance: Pond 91 BY: AM <br />{ Phase 1 -50,000 TONS CHK: GD <br /> Bottom Width 255.0' Bottom Radius 15.0' Start Month August <br /> Bottom Length 175.0' Top Radius 35.0' Min, Depth 8.0' <br /> Side Slope(x:1) 3.0 Depth 12.0' Annual PW 21.18 Mgal <br /> Freeboard 2.0' Initial Depth 10.0' <br /> i Dearth Length Width Radius Surface Area Total Volume <br /> (1•t) (ft) (ft) (ft) (ft) (Mgaal) <br /> 0 175 255 15.0 44,433 0.000 <br /> t 1 181 261 16.7 47,004 0.342 <br /> 2 187 267 18.3 49,642 0.703 <br /> 3 193 273 20.0 52,347 1.085 <br /> 4 199 279 21.7 55,120 1.487 <br /> 5 205 285 23.3 57,960 1.910 <br /> 6 211 291 25.0 60,867 2.354 <br /> 7 217 297 26.7 63,842 2.821 <br /> 8 223 303 28.3 66,883 3.310 <br /> 9 229 309 30.0 69,992 3.822 <br /> 10 235 315 31.7 73,169 4.357 <br /> a 11 241 321 33.3 76,412 4.917 <br /> 1.2 247 327 35.0 79,723 5.501 <br /> 1 <br /> Month Projected Average Rainfall 100 Year Pan Evaporation Projected <br /> Wastewater Rainfall Evaporation <br /> (M al) (in) (in) (in) (in) <br /> August 2.65 0.0 0.1 9.0 6.9 <br /> s September 3.40 0.3 0.6 6.8 5.2 <br /> October 4.22 0.9 1.7 4.2 3.3 <br /> November 3.10 2.0 3.7 1.9 1.4 <br /> December 2.75 3.0 5.7 1.1 0.8 <br /> January= 0.84 3.4 6.5 1.2 0.9 <br /> Februap, 1.15 2.8 5.4 2.0 1.5 <br /> March 1.3 5 2.7 5.2 3.9 3.0 <br /> April 0.94 1.2 2.3 6.0 4.7 <br /> Mav 0.89 0.6 1.2 8.7 6.7 <br /> June 0.53 0.1 0.3 10.0 7.7 <br /> July 0.73 0.0 0.0 10.7 8.2 <br /> Total 22.548 17.2 32.7 65.3 50.3 <br /> i <br /> J <br /> Page 3 of 7 7121101 <br />