Laserfiche WebLink
SUMMIT ENGINEERING,INC. SUTTER HOME PROJECT NO. 2001015 <br /> Consulting Civil Engineers Pond Water Balance: Pond#1 BY: AM <br /> Phase 1-50,000 TONS CHK: <br /> i <br /> Month Initial Pond PW Inflow 100 Year Volume Total Volume Divert Final Volume <br /> Volume Evaporation Precipitation Change Volume <br /> (M-al) (M al) (Mgal) (Mgal) gal) (M al) (Meal) al <br /> ugust 4.357 -0.315 2.645 0.003 2.333. 6.690 2.333 4.357 <br /> September 4.357 -0.238 3.401 0,028 3.191 7.548 3.191 4.357 <br /> October 4.357 -0.149 4.219 0.084 4,155 8.512 4.155 4.357 <br /> November 4.357 -0.066 3.100 0.185 3.219 7,576 3,219 4.357 <br />` December 4.357 -0.037 2.751 0.286 3.000 7.358 3.001 4.357 <br /> January 4.357 -0.042 0.840 0.324 1.122 5.479 1.122 4.357 <br /> ebruar_y 4.357 -0.069 1.149 0.269 1.349 5.706 1.349 4.357 <br /> March 4.357 -0.136 1.352 0.256 1.473 5.830 1.473 4.357 <br /> pn1 4.357 -0.212 0.943 0.116 0.848 5.204 0.847 4.357 <br /> May 4.357 -0.305 0.889 0.059 0.643 5.000 0.643 4.357 <br /> June 4.357 -0.351 0.528 0.013 0.190 4.547 0.190 4.357 <br /> July 4.357 -0.374 0.730 0.002 0.358 4.715 0.358 4,357 <br /> Total -2.293 22.548 1.626 21.881 21.881 <br /> i <br /> 1 <br /> Page 4 of 7 7121101 <br />