Laserfiche WebLink
E <br /> SUMMIT ENGINEERING,INC. SUTTER HOME PROTECT NO. 2001015 <br /> Consulting Civil Engineers Pond Water Balance:Pond#2 BY: AM <br /> Phase 1-50,000 TONS CHK: <br /> Month Initial Pond PW Inflow 100 Year Volume Total Volume Divert Final Volume <br /> Volume Evaporation Precipitation Change Volume <br /> (Mgaq gal) (Meal) (Mol) (Meal) (Mgal) (M al) (Meal) <br /> ugust 1.085 -0.225 2.333 0.003 2.110 3.195 0.000 3.195 <br /> September 3.195 -0.215 3.191 0.028 3.004 6.200 3.032 3.168 <br /> October 3.168 -0.134 4.155 0.084 4.106 7.273 4.103 3.170 <br /> November 3.170 -0.059 3.219 0,185 3.345 6.516 3.340 3.176 <br /> December 3.176 -0.033 3.001 0.286 3.253 6.429 2.038 4,391 <br /> January 4.391 -0.042 1.122 0.324 1.405 5.796 1.405 4.391 <br /> February 4.391 -0.069 1.349 0.269 1.549 5.939 1.549 4.390 <br /> March 4.390 -0.136 1.473 0.256 1.593 5.984 1.594 4.390 <br /> MApril 4.390 -0.212 0.847 0.116 0.751 5.141 0.752 4.389 <br /> May 4.389 -0.305 0.643 0.059 0.397 4.786 0.397 4.389 <br /> June 4.389 -0.351 0.190 0.013 -0.148 4.241 1.500 2.741 <br /> July 2.741 -0.324 0.358 0.002 0.036 2.778 1.663 1.115 <br /> Total -2.105 21.881 1.626 21.403 21.373 <br /> I <br /> Page 6of 7 7121/01 <br />