Laserfiche WebLink
SUMMIT ENGINEERING,INC. SUTTER HOME PROJECT NO. 2001015 <br /> Consulting Civil Engineers Pond Water Balance: Pond#2 BY: AM <br /> I Phase 1 -50,000 TONS CHK: <br /> i <br /> Bottom Width 255.0' Bottom Radius 15.0' Start Month August <br /> Bottom Length 175,0' Top Radius 35.0' Minimum Depth 3.0' <br /> Side Slope(s:1) 3.0 Depth 12,0' Divert Volume 21.88 Mgal <br /> Length;Width 1.3 Freeboard 2.0' Initial Depth 3.0' <br /> Depth Length Width Radius Surface Area Total Volume <br /> (ft) (ft) (ft) (ft) (ft) (Mgal) <br /> 0 175 255 15.00 44433 0.000 <br /> 1 181 261 16.67 47004 0.342 <br /> 2 187 267 18.33 49642 0.703 <br /> 3 193 273 20.00 52347 1.085 <br /> 4 199 279 21.67 55120 1.487 <br /> 5 205 285 23,33 57960 1.910 <br /> 6 211 291 25.00 60867 2.354 <br /># 7 217 297 26.67 63842 2.821 <br /> 8 223 303 28.33 66883 3.310 <br /> 9 229 309 30.00 69992 3.822 <br /> 10 235 315 31.67 73169 4.357 <br /> 11 241 321 33.33 76412 4.917 <br /> 12 247 327 35.00 79723 5.501 <br /> Month Projected Average Rainfall 100 Year Rainfall Pan Evaporation Projected <br /> Wastewater Flow Evaporation <br />` (Mgal) (in) (in) (in) (in) <br /> August 2.333 0.0 0.1 9.0 6.9 <br /> September 3.191 0.3 0.6 6,8 5.2 <br /> October 4.155 0.9 1.7 4.2 3.3 <br /> November 3,219 2.0 3,7 1.9 1.4 <br /> December 3.001 3.0 5.7 1.1 0.8 <br /> January 1.122 3.4 6.5 1.2 0.9 <br /> February 1.349 2.8 5.4 2.0 1.5 <br /> March 1.473 2.7 5,2 3.9 3.U <br /> April 0.847 1.2 2.3 6.0 4.7 <br /> May 0.643 0.6 1.2 8.7 6.7 <br /> June 0.190 0.1 0.3 10.0 7.7 <br /> July 0.358 0.0 0.0 10.7 8.2 <br /> Total 21.881 17.2 32.7 65.3 50.3 <br /> Page 5 of 7 7121101 <br />