Laserfiche WebLink
SUMMIT ENGINEERING,INC. SUTTER HOME PROJECT NO. 2001015 <br /> INE , <br /> Consulting Civil Engineers Pond Water Balance: Pond#1&2 BY: AM <br /> Phase 2-100,000 TONS CHK: <br /> Munth Initial Pond PW Inflow 100 Year Volume Total Divert Final Volume <br /> Volume Evaporation Precipitation Change Volume Volume <br /> (Mgal) (M al) (Mgal) (Mgal) (Mgal) (Mgal) (Mgal) (Mgal) <br /> August 8.714 -0.630 5.042 0.006 4.417 13.132 4.417 8.715 <br /> September 8.715 -0.477 6.508 0.057 6.088 14.803 6.088 8.715 <br /> October 8.715 -0.297 8.131 0.170 8.004 16.719 8.005 8.714 <br /> November 8.714 -0.126 5.007 0.371 5.252 13.966 5.252 8.714 <br /> December 8.714 -0.071 4.389 0.571 4.889 13.604 4.889 8.715 <br /> January 8.715 -0.084 1.230 0.649 1.795 10.510 1.796 8.714 <br /> -ebruary 8.714 -0.132 1.764 0.537 2.170 10.883 2.169 8.714 <br /> March 8.714 -0.272 2.104 0.513 2.344 11.059 2.345 8.714 <br /> Aril 8.714 -0.406 1.496 0.233 1.323 10.037 1.323 8.714 <br /> May 8.714 -0.583 1.433 0.117 0.967 9.682 0.967 8.715 <br /> 3une 8.715 -0.702 0.861 0.026 0.186 8.900 0.186 8.714 <br /> July 8.714 -0.716 1.199 0.004 0.487 9201 0.487 8.714 <br /> Total -4.495 39.164 3.254 37.924 37.924 <br /> i <br /> Page 5 of 8 7121/01 <br />