Laserfiche WebLink
SUMMIT ENGINEERING,INC. SUTTFR HOME PROJECT NO. 2001015 <br /> Consulting Civil Engineers Pend Water Balance: Pond#3 BY: AM <br /> Phase 2-100,000 TONS CHK: <br /> Bottom.Width 200.0' Bottom Radius 15.0' Start Month August <br /> Bottom Length 437.0' Top Radius 35.0' Minimum Depth 3.0' <br /> Side Slope(x:1) J.0 Depth 12,0 Divert Volume 37.92 Mgal <br /> Length:Width 3.0 Freeboard 2.0' Initial Depth 3.0' <br /> Depth Length Width Radius Surface Area Total Volume <br /> (ft) (ft) (ft) (ft) (ft) (Mgal) <br /> 0 437 200 15.00 87208 0,000 <br /> 1 443 206 16.67 91021 0.667 <br /> 2 449 212 18.33 94901 1.362 <br /> i 3 455 218 20.00 98848 2.087 <br /> 4 461 224 21.67 102.863 2.841 <br /> 5 467 230 23.33 106945 3.626 <br /> 6 473 236 25.00 111094 4.441 <br /> 7 479 242 26.67 115311 5.288 <br /> 8 485 248 28.33 119594 6.167 <br /> 9 491 254 30.00 123945 7.078 <br /> 10 497 260 31.67 128364 8.021 <br /> 11 503 266 33.33 132849 8.998 <br /> 12 509 272 35.00 137402 10.009 <br /> Month Projected Average Rainfall 100 Year Rainfall Pan Evaporation Projected <br /> Wastewater Flow Evaporation <br /> (Mgal) (in) (in) (in) (in) <br /> August 4.417 0.0 0.1 9.0 6.9 <br /> September 6.088 0.3 0.6 6.8 5.2 <br /> October 8.005 0.9 1.7 4.2 3.3 <br /> November 5.25 2 2.0 3.7 1.9 1,4 <br /> December 4.889 3.0 5.7 1.1 0.8 <br /> January 1.796 3.4 6.5 1.2 0.9 <br /> February 2.169 2.8 5.4 2.0 1.5 <br /> March 2.345 2.7 5.2 3,9 3.0 <br /> April 1.323 1.2 2.3 6.0 4.7 <br /> May 0.967 0.6 1.2 8.7 6.7 <br /> June 0.186 0.1 0.3 10.0 7.7 <br /> July 0.487 0.0 0.0 10.7 8.2 <br /> Total 37.924 17.2 32.7 65.3 50.3 <br /> Page 6 of 8 7/21/01 <br />