Laserfiche WebLink
E <br /> E <br />! SUMMIT ENGINEERING,INC_ SUTTER HOME PROJECT NO. 2001015 <br /> Consulting Civil Engineers Pond Water Balance:Pond#3 BY: AM <br /> Phase 2-100,000 TONS CHK: <br /> Month Initial Pond PW Inflow 100 Year Volume Total Volume Divert Final Volume <br /> Volume Evaporation Precipitation Change Volume <br /> (Mgal) (Mgal) (Mgal al) (Mgal) gal (Mgal) (Mga1) <br /> ugust 2.087 -0.426 4.417 0,005 3.996 6.083 3.600 2.483 <br /> September 2.483 -0.329 6.088 0.049 5.808 8.291 5.800 2.491 <br /> October 2.491 -0.205 8.005 0.147 7.947 10.438 7.500 2.938 <br /> avember 2.938 -0.093 5.252 0.320 5.479 8.417 3.955 4.462 <br /> December 4.462 -0.056 4.889 0.492 5.325 9.787 2.060 7.727 <br /> January 7.727 -0.072 1.796 0.559 2.283 10.010 2.443 7.567 <br /> f February 7.567 -0.119 2.169 0.463 2.513 10.081 2.060 8.021 <br /> March 8.021 -0.238 2.345 0.442 2.549 10.570 2.549 8.021 <br /> pH 8.021 -0.371 1.323 0.201 1.153 9.174 1.153 8.021 <br /> May 8.021 -0.533 0.967 0.101 0.535 8.556 0.535 8.021 <br /> June 8.021 -0.613 0.186 0.023 -0.405 7.616 2.500 5.116 <br /> July 5.116 -0.586 0.487 0.003 -0.095 5.021 2.934 2.087 <br /> Total -3.639 37.924 2.804 37.089 37.089 <br /> I <br /> 6 <br /> Page lot 8 7121101 <br />