Laserfiche WebLink
i <br /> b. The driveway approach shall berovedjn accordance with the requlrernents:of San: <br /> Joaquin County Standard R-17.-pdor.to issuance`of tl�e occupancy permit '(Deveiopmerit <br /> Title Section 9-1145.5) <br /> C. The Traffic Impact Mitigation Fee;will be required for-this de relop►nent The tee-is due <br /> and payable at the.time of,building permit appEicaiian: Ths tee Curren#ly,is $143:38 per _ <br /> daily trip-end generated:iriA Thorn on,area. The.€pe s_hell .e automaiicaliy-adfuste . <br /> July 1 of each ,year by #he:.Engine ering Con iruciton Cast:Index as psled :by:the <br /> Engineering. News Record. (Resolutions R'90-304, Ra31�fp25;,R-_0-1$71 0-94-1790 R <br /> 95-650, and R-96-592) <br /> d. A traffic study shall be prepared to determine the impacts and mitigation measures for <br /> the following: <br /> (1) Turner Road off-ramps and on-ramps to Interstate 5 intersections. <br /> (2) Project access. <br /> (3) Turner Road and Thornton Road intersection. <br /> (4) Jacob Brack Road, north of Turner Road. <br /> (5) Truck movement from southbound Interstate 5 off-ramp to northbound Jacob <br /> Brack Road. <br /> e_ The developer shall deposit funds with the County for all costs, as estimated by the <br /> Public Facilities Division of the Department of Public Works, prior to Public Works <br /> preparing ar contracting for the required traffic study. Any mitigations required by the <br /> traffic study shall be provided by the applicant. (Development Title Section 9-1150.4) <br /> f_ A copy of the Improvement Plan shall be submitted prior to release of the building <br /> permit_ <br /> g. Verification shall be obtained from the Solid Waste Division (1209] 468-3066) that this <br /> development has addressed the items on the attached Waste Plan Format for <br /> Development Projects. <br /> 3. PUBLIC HEALTH SERVICES: (Staff Contact: Greg Oliveira, 468-3443) <br /> a. Submit an improvement plan to the San Joaquin County Community Development <br /> Department for approval by the Environmental Health Division which shows sewage and <br /> well information (including a 100 percent expansion area). <br /> b. State on revised plans or improvement plans the maximum number of employees the <br /> sewage disposal system is being designed for and that the leach field area will be <br /> barricaded so it cannot be driven over, parked on, or used as a storage area. This leach <br /> field are must be used for that specific purpose only and cannot contain any <br /> underground utility lines. (Development Title Section 9-1110.4[cl[5]) <br /> C. Construction of an individual sewage disposal system under permit and inspection by the <br /> Environmental Health Division is require at the time of development. (Development <br /> Title Sections 9-1110.3 and 9-1110.4) <br /> ' d. Construct a water well under permit and inspection of the Environmental Health Division <br /> prior to occupancy. Should the number of nonresident individuals exceed 24 for at least <br /> 60 days per year, or the number of service connections exceed four, a yearly permit to <br /> operate a public water system under the provisions of Title 22, CCR, will be required by <br /> the Environmental Health Division and Development Title Sections 9-1120.2 and 9- <br /> 1115.9_ <br /> :onditions of Approval - 3 - UP-98-6 <br /> i <br />