Laserfiche WebLink
v <br /> Addendum No 1 <br /> May 20,2003 <br /> The survey map depicts the locations of the test holes. The holes were drilled with a truck <br /> mounted auger and the 24 hour soak began on Feb. 6,2003,at 1000 hours. The physical testing <br /> began on Feb. 7, 2003, after the 24 hour soak.No water remained in the test holes after the <br /> required soak. The procedure conformed to the requirements of SJC Policy EHD02-02. <br /> 3�1 <br />