Laserfiche WebLink
d. The frontage improvements for Jahant Road shall be constructed in conformance with the.standards <br /> for one-half of-a 30-foot-wide right-of-way collector street. The-frontage improvements far Lower <br /> Sacramento-Road;.shall be constructed in conformance with the standards for one-half.of a42-foot- <br /> wide <br /> 42-foot-wide right=of-way collector street. The construction of the frontage improvements will.bedeferred <br /> -upon execution by the owner of a Deferred.Froritage.and Roadway lmproveiment Agreement ora " <br /> Secured.Deferred Frontage and Road Improvement'Agreement with-a deposit equivaienf to the <br /> estimated construction costs prior to approval of the.lrnprovemer)t Pian: A$4.16:0.04 cuifently is <br /> required fior processing,-per Development Title Table 9-240.2, in addition;to a=copy of tt erantDeed <br /> and an estimate for the;required frontage Gmprovements The estimate shall be prepared by a r a <br /> registered civil engineer with a-typical section;drawing.on a.form to.be supplied by Public Works for <br /> approval:-dAs an;dptiori, Public Works will prepare the drawing and estimate foran additional fee of: <br /> $175:00: The fee:dpe Will be based on the current fee schedule: (Development Title Section 9= h . <br /> 1150.,2);:, <br /> e. Traffic volume for the proposed facility shall'not exceed 130 vehicles per day(one-way), 4.which 70 <br /> vehicles will be allowed to be trucks with four or more axles. Additionally,the maximum number of <br /> trucks in a'peak hour shall not exceed nine trucks. <br /> f. The applicant shall maintain records of the facility's annual traft volumes to the-satisfaction of Public <br /> Works. :The applicant shall also maintain a record of daily traffic volumes during the period of peak <br /> activity corresponding to harvesticrushing time. An annual report of these traffic volumes shall be <br /> submitted to the Public Services Division of Public Works. The annual report shall be in a format <br /> approved by Public Works. The requirement for maintaining traffic volume records and submittal of <br /> annual reports shall not go into effect until implementation of Phase 5. At the County's option, <br /> additional traffic surveys may be conducted by the County to independently determine the total daily <br /> traffic volume, the percentage of trucks,.and the peak hour truck volume. Scheduling of the surveys <br /> shall be at the County's discretion except that no more than two surveys may be conducted in any <br /> given calendar year. All costs associated with maintaining traffic records, submitting annual reports, <br /> and conducting independent surveys shall be at the applicant's expense. <br /> g. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable <br /> at the time of building permit application. The fee currently is$193.16 per daily trip-end generated in <br /> the Lodi area. The fee shall be automatically adjusted July 1 of each year by the Engineering <br /> Construction Cost Index as published by the Engineering News Record. (Resolution R-00-433) <br /> h. A copy of the Final Site Plan shall be submitted prior to the release of building permits_ <br /> i. Verification shall be obtained from the Solid Waste Division (468-3066)that this development has <br /> met the requirements of the Waste Plan Format for Development Projects. The Final Site Plan is <br /> required upon submittal of verification. <br /> j. The applicant/developer shall file a Notice of Intent to comply with a State NPDES construction <br /> permit from the State Water Resources Control Board and develop a Storm Water Pollution <br /> Prevention Plan permit for each phase prior to the beginning of any construction. <br /> k. All new structures shall be prohibited within the Federal Emergency Management Agency's <br /> designated floodway of Jahant Slough or within 25 feet for the top of banks of Jahant Slough, <br /> whichever is greater. <br /> I. The applicantldeveloper shall keep Jahant Slough free of all obstacles that impede the flow of water, <br /> and any alteration to the slough will require obtaining a Watercourse Encroachment Permit from the <br /> San Joaquin County Department of Public Works. <br /> San Joaquin County PA-0500424/Lange <br /> Community Development Page 13 <br />