Laserfiche WebLink
X U <br /> c. Dedication to result in a 30-foot-wide right-of-way from the centerline of Jahant Road to the property <br /> line shall be'required across the frontage of APN 003-150-08 Dedication,to result in a.42 foot-wide <br /> ri ht-of-wa from the centerline of Lower Sacramento Road to the-propertyline shall be required <br />! g. y . . .. q <br /> across the frontage.of APN003-150-08:`(Development'Titie,Section 9,11`50.5) <br /> d. The frontage impraVements'for Jahant.Road shall beconstriicted in confomiance with the standards <br /> for one-half.of a 30466t-Wide right-of way collector street The frontagez rnprovements.for Lower ,, <br /> cramento Road shall be con"structed in con ormance with'the standards fcir one half:of a 42-foof- <br /> wide right-of way collector street The construction`of the froritage improvements will be'deferred' <br /> upon execution;by the ain►ner of a Deferred Frontage and Roadways lmpr'ovement Agreement o'r a <br /> Secured Deferred Frontage and Road lmprovement'Agreemeht wifh a deposit equivalent to the <br /> estimated construction costs prior to a} proval of theamprovement Plan. A$4.10.00 fee currently is <br /> required for-processing; per De�eloprrient Title Table.:9-240:2 in addition to a copy of the Grant Deed <br /> and an estimate for the required frontage improvements .'Tlha-estimate shall be prepared,by a <br /> registered civil engineer with aaypical section dr, ing on.a fi5mi to'be supplied by.Public Works for <br /> approval. Asian option, Public Works'will prepare the drawing and-estimate for.an'.additional fee of. <br /> $175.00. The fee due will be based on the:current fee schedule. (Development Title Section 9- <br /> 1150.2) <br /> i <br /> e_ Traffic volurne for the proposed facility shall nqt excee6130 vehicles per day(one-way.), of which 70 <br /> vehicles will be allowed to be trucks with four or more axles. Additionally,the maximum number of <br /> trucks in a peak hour shall not exceed nine trucks. <br /> f. The applicant shall maintain records of the facility's annual traffic volumes to the satisfaction of Public <br /> Works. The applicant shall also maintain a record of daily traffic volumes during the period of peak <br /> activity corresponding to harvesttcrushing time. An annual report of these traffic volumes shall be <br /> submitted to the Public Services Division of Public Works. The annual report shall be in a format <br /> approved by Public Works. The requirement for maintaining traffic volume records and submittal of <br /> annual reports shall not go into effect until implementation of Phase 5. At the County's option, <br /> additional traffic surveys may be conducted by the County to independently determine the total daily <br /> 1 traffic volume, the percentage of trucks,and the peak hour truck volume. Scheduling of the surveys <br /> shall be at the County's discretion except that no more than two surveys may be conducted in any <br /> given calendar year. All costs associated with maintaining traffic records, submitting annual reports, <br /> and conducting independent surveys shall be at the applicant's expense. <br /> g. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable <br /> at the time of building permit application. The fee currently is$193.16 per daily trip-end generated in <br /> the Lodi area. The fee shall be automatically adjusted July 1 of each year by the Engineering <br /> Construction Cost Index as published by the Engineering News Record. (Resolution R-00-433) <br /> h. A copy of the Final Site Plan shall be submitted prior to the release of building permits. <br /> i. Verification shall be obtained from the Solid Waste Division (468-3066)that this development has <br /> met the requirements of the Waste Plan Format for Development Projects. The Final Site Plan is <br /> required upon submittal of verification. <br /> j. The applicanttdeveloper shall file a Notice of Intent to comply with a State NPDES construction <br /> permit from the State Water Resources Control Board and develop a Storm Water Pollution <br /> Prevention Plan permit for each phase prior to the beginning of any construction. <br /> k. All new structures shall be prohibited within the Federal Emergency Management Agency's <br /> designated floodway of Jahant Slough or within 25 feet for the top of banks of Jahant Slough, <br /> whichever is greater. <br /> i <br /> Conditions of Approval - 5 - PA-0500424 <br />