Laserfiche WebLink
additional application and fee will be required at a later date. The road name must be <br /> approved prior to recordation of a final map. The applicant may contact Kimberly Wallace <br /> at 468-0816 for road name standards. (Development Title Section 9-1150.18) <br /> Storm Drainage <br /> The tentative map states that natural storm water run-off will be retained on site. The <br /> tentative map also shows an existing drainage basin on an adjacent subdivision to the <br /> west. The applicant needs to confirm that there is no intention of diverting storm water run- <br /> off from the proposed subdivision into the existing storm drainage basin on the adjacent <br /> subdivision. <br /> NOTE: The pre-application conference is designed to inform prospective applicants of <br /> General Plan consistency, zoning consistency, public improvement requirements, <br /> preliminary design constraints and opportunities, and major environmental and safety <br /> issues. This information is provided in the hope of assisting the applicant in submitting a <br /> better and more complete application, as well as minimizing processing time. It is not <br /> intended to be an in-depth analysis, and an environmental assessment is not completed. <br /> The applicant should be aware that a detailed review will not be done until the full <br /> application is submitted. Also, if new or additional information is obtained, a revised <br /> application or Environmental Impact Report may be required. <br /> JJ:vb <br /> PA-0400251(SU)DCp061704 <br /> Attachments <br /> C: Stacey Griffith <br /> 2 <br />