Laserfiche WebLink
r <br /> r ; The well was tested by FarWest Labs in Jan. 2006,the results are included in this report and are <br /> summarized as follows: <br /> r ✓DBCP- 0.01 ;Nitrates 16.0 m The water meets current potable water standards with <br /> respect to a two tests. <br /> There is no third party involved in the sampling and testing of the well. A copy of the Log-hi <br /> Record book is included with the test report.No representative of Smith&Associates was <br /> present during the sampling process. <br /> / SOIL PROFILE INFORMATION <br /> /There is no soil profile pit as the classification of the soil is determined by observation of the <br /> r degree of difficulty in drilling and the material removed from the hole. <br /> The general description based on drilling the three lots is as follows: <br /> r <br /> 0' - 3'soft clay <br /> Y - 7'hard pan <br /> r, <br /> 7 -20 clay, soft,wet <br /> 20-23 hard pan <br /> L23'- 25' sand, damp <br /> /The soil surface texture may be described as silt loam. The soil drainage class would be <br /> moderately well drained. Pits are required to reach the sand layer. The depth of the sand layer is <br /> not known as the drilling was terminated at the 25'depth. <br /> PERCOLATION TEST INFORMATION <br /> The location of the test holes are plotted on the Tentative Parcel Map. As a minimum a 42" hole <br /> (shallow) and a 25'hole(deep) are augured and the soil examined. The next hole depth is <br /> determined by the location of a sand layer, if found. Thus at least 3 holes are tested on each lot. <br /> The following description pertains to the protocol used: <br /> Date holes tested: 5/16/06 <br /> Time of testing: 0900 begin&4 hours duration <br /> Pre-soak began: 0900, 5/15/06, 12" of water placed in 42" hole& 6" in deep holes <br /> All test holes were dry after pre-soak period. <br /> The holes are sleeved as soon as possible after drilling and after placement of 2" of gravel on the <br /> ` bottom. (See Smith&Assoc. hole prep sheet) <br /> The testing conformed to SIC Policy EHD 02-02. <br /> The Percolation Test Forms were completed in the field recording the measurements obtained by <br /> a battery operated meter and measuring from a reference point each time. <br /> The rate was calculated using the last reading on the selected hole on each of the 3 lots. <br /> 2. <br />