My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0003053
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KASSON
>
28864
>
2600 - Land Use Program
>
SA-94-28
>
SU0003053
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:29:38 AM
Creation date
9/6/2019 10:34:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0003053
PE
2633
FACILITY_NAME
SA-94-28
STREET_NUMBER
28864
Direction
S
STREET_NAME
KASSON
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
24138002
ENTERED_DATE
11/6/2001 12:00:00 AM
SITE_LOCATION
28864 S KASSON RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\K\KASSON\28864\SA-94-28\SU0003053\APPL.PDF \MIGRATIONS\K\KASSON\28864\SA-94-28\SU0003053\EH COND.PDF \MIGRATIONS\K\KASSON\28864\SA-94-28\SU0003053\EH PERM.PDF \MIGRATIONS\K\KASSON\28864\SA-94-28\SU0003053\CORRESPOND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COMMENTS ON DEVELOPMENTS FOR SA-94-28 <br /> RECOMMENDATIONS : <br /> 1. Encroachment permit shall be required for work within road <br /> right-of-way. (Development Title Section 9-1145 . 2 ) <br /> 2 . The driveway approach shall be improved in accordance with the <br /> requirements of the San Joaquin County Standards R-17 prior to <br /> issuance of the occupancy permit. <br /> (Development Title Section 9-1145 . 5) <br /> 3 . The Traffic Impact Mitigation Fee will be required for this <br /> development. The fee is due and payable at the time of <br /> building permit application. The fee currently is $1 , 767 . 00 <br /> per single family, $1, 158 . 00 per multi family dwelling unit, <br /> $675. 00 per 1, 000 gross square foot of building as <br /> manufacturing or $175 . 62 per daily trip-end generated in the <br /> Tracy area. The fee shall be automatically adjusted July 1 of <br /> each year by the Engineering Construction Cost Index as <br /> published by the Engineering News Record. ) <br /> (Resolution R-90-304 , R-91-1025, R-93-167 , R-94-174) <br /> c: Manuel Lopez <br /> Deputy Director/Development <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.