My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012410
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KELSO
>
15653
>
2600 - Land Use Program
>
PA-0600327
>
SU0012410
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2022 1:51:43 PM
Creation date
9/6/2019 10:35:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012410
PE
2611
FACILITY_NAME
PA-0600327
STREET_NUMBER
15653
Direction
S
STREET_NAME
KELSO
STREET_TYPE
RD
City
TRACY
Zip
95391-
APN
25802035
ENTERED_DATE
7/10/2019 12:00:00 AM
SITE_LOCATION
15653 S KELSO RD
RECEIVED_DATE
7/19/2019 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\tsok
Supplemental fields
FilePath
\MIGRATIONS\K\KELSO\15653\PA-0600327\SU0012410\APPL.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOUNTAIN HOUSE SPECIFIC PLAN 11 <br /> �.5 PHASiNG AND COSTS <br /> Master Plan Summary <br /> Electrical power distribution will be installed on an as-needed basis as part of the on-site <br /> roadways. The only exoeptlons to this incremental construction have been the extension <br /> o4 the initial temporary service lines for the first Specific Plan and the slfing and <br /> construction of the permanent oomnlunity electrical substation_ The initial service line <br /> extensions will require accelerated plarining and construction to coincide with the start of <br /> resid"ial development. <br /> Natural gas will also be provided on an as-needed basis as part of the on-site roadways. <br /> However,Vie relocation of the existing gas line from Mountain House parkway to Central <br /> Parkway will require detailed planning and phasing. <br /> Telecommunications will also he provided on an as-needed basis and will be developed <br /> along wittl on•sita roadways. <br /> Plan Description <br /> The Master Plan rggltirements related to phasing and oasts will tie implemented by Sell <br /> through the implementation measure listed below. <br /> SPIT'Implementation Measures <br /> 1, Phasing and Costs. All implementing projects shall comply with the <br /> applicable requirements of the Public Financing Plan and TechnIca I Report, <br /> Master Acquisition and Reimbursement Agreement between the MHCSO and <br /> Trimark Communities, Master Plats Dave lopment A g reem ent between San <br /> Joaquin County and Tel FRaFolk 0rRumitles;ILL 2the Masker Developer, <br /> M4CSU Capital Improvement Program,and applicob le development fee <br /> Ordinances. <br /> C MAPTER EIGHT ENERGY AND TELECOMMUNICATIONS PAGE 8.10 <br /> Resolution Template 01/2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.