41. Sound walls, meeting the design requirements contained in the MHCSD Design Guidelines, shall <br /> be installed on arterial streets when the adjacent development (or phased development) has <br /> abutting lots. The length of the sound wall shall match the total length of the lots abutting the <br /> arterial street plus an additional length that will close a gap to a previously constructed wall not <br /> more than 200 feet away. <br /> 42. The sound walls shall be constructed consistent with the MHCSD Design Manual, the Master <br /> Plan and as shown on the preliminary sound wall plans. The noise barrier may consist of a wall, <br /> berm, or combination thereof the exact location, height and character of the sound barrier shall be <br /> determined by a noise consultant approved by the County and the MHCSD. The sound barrier <br /> shall reduce outdoor noise levels at the center of backyards of proposed adjacent single-family <br /> residences to below 65 dBA Ldn/CNEL and as close to 60 dBA Ldn/CNEL as feasible. <br /> 43. Except when the MHCSD General Manager specifies otherwise, when a sound wall is installed <br /> on an arterial street, the adjacent street edge landscaping, sidewalk, and street curb & gutter <br /> shall also be installed. <br /> 44. The developer shall coordinate the MHCSD to locate bus stops within the residential portions of <br /> the project pursuant to the requirements of the MHCSD's TDM and TSM policy document. <br /> 45. Construction Traffic shall comply with the Construction Truck Management Plan administered by <br /> the MHCSD. Project construction plans shall include specifications to the contractor outlining <br /> compliance requirements. <br /> 46. To control erosion and sedimentation during project construction and operation, the developer <br /> shall comply with MHMP policies, MHMP mitigation measures, and Phase I and II NPDES permit <br /> requirements, including the preparation and implementation of a SWPPP that outlines BMPs to <br /> be followed to minimize erosion and sedimentation during project construction and operation. <br /> 47. All non-residential (i.e. Office, Industrial, Commercial, etc), uses must perform a pretreatment of <br /> all storm flows before the flows enter a public storm system. The design shall be in accordance <br /> with the Storm Water Master Plan Update and NPDES requirements. The MHCSD shall review <br /> and approve the plans and the specifications for the storm pretreatment prior to issuance of the <br /> building permit. <br /> 48. Water Quality Basins Mosquito Abatement: Plans for the implementation and maintenance of <br /> the water quality basins and any other storm drainage facilities involving open bodies of water <br /> shall be reviewed and approved by the MHCSD and if required by the MHCSD, reviewed by the <br /> mosquito Abatement District. <br /> Timing: Condition shall be met before approval of first Final Map. <br /> 49. Utilities: <br /> a. The Developers and contractors shall comply with Ordinance No. 4162 "Street Opening <br /> and Pavement Restoration Regulations". <br /> b. When any portion of an arterial street is to be included in a development's construction <br /> plans, then all of the buried utilities that are ultimately planned to be within the <br /> improvement area shall be installed as part of the street improvement project regardless <br /> if any of the utilities are required for any phase of the development associated with the <br /> street construction. Conduits or sleeves may be installed in lieu of the buried utility if <br /> approved by the MHCSD. <br /> c. Any phased development shall install all "in-tract" utilities required to serve the <br /> development. In addition, if any future adjacent or nearby phases of the development, or <br /> adjacent Neighborhoods, will depend on obtaining service from such utilities, then the <br /> utility lines shall be sized to serve these future developments. Any utility lines that are <br /> intended to be used by an adjacent development or Neighborhood shall be installed up to <br /> the phase or Tentative Map boundary line to make it available for future extension. To <br /> Resolution Template 01/2017 <br />