Laserfiche WebLink
concurrently with the adjacent Street Improvement Plans. Timing: Improvement Plans <br /> for entries shall be approved by MHCSD prior to the approval of the project's Final Map. <br /> f. The roadway landscape construction plans shall be processed and approved by the <br /> MHCSD General Manager concurrently with the Improvement Plans for any phase on the <br /> project. <br /> g. The collector street network and landscape treatments shall comply with all Community <br /> Approvals including applicable provisions of the MHCSD Design Manual and MHCSD <br /> Standards. <br /> h. Landscaping and architectural design of all parcels, designated as HOA and/or <br /> Landscape Maintenance District, including Community Edges shall be consistent with all <br /> Community Approvals including applicable provisions of the MHCSD Design Manual and <br /> MHCSD Standards. The design plans associated with each phase of the development <br /> shall be completed and approved by the MHCSD General Manager prior to the approval <br /> of the Final Map for that phase. <br /> i. Masonry walls shall be installed at the property line between residential properties and all <br /> public or private parcels designated as HOA and/or Landscape Maintenance District <br /> unless restricted by Community Approval. View Fencing or no fencing may be permitted <br /> in locations where residences face the Open Space as deemed appropriate by MHCSD. <br /> Wall/Fencing Plans to be consistent with all Community Approvals including applicable <br /> provisions of the MHCSD Design Manual, MHCSD Standards, and any applicable <br /> Special Purpose Plan. Timing: Improvement Plans approved by CDD and MHCSD prior <br /> to first building permit. <br /> j. Sound Walls and HOA Walls shall be consistent with all Community Approvals including <br /> applicable provisions of the MHCSD Design Manual, MHCSD Standards, and any <br /> applicable Special Purpose Plan. Timing: Improvement Plans approved by CDD and <br /> MHCSD prior to first building permit. <br /> k. All landscape pedestrian through-block connections shall be a minimum of 30 foot width. <br /> Timing: prior to approval of the first Final Map. <br /> I. Pedestrian through-block connections shall be owned, developed and maintained by a <br /> separate maintenance entity. These parcels shall be designed and landscaped <br /> consistent with all Community Approvals including applicable provisions of the MHCSD <br /> Design Manual and shall require a funding mechanism for maintenance acceptable to <br /> MHCSD. Utility line easements acceptable to MHCSD shall be dedicated to MHCSD. <br /> Timing: financing mechanism shall be completed and adopted by the Board of Directors <br /> prior to the approval of the first Final Map. Plans shall be reviewed and approved by <br /> MHCSD prior of approval of the first Building Permit. Landscaping shall be installed <br /> concurrently with adjacent streets. <br /> m. Landscape slopes within street right of way, pedestrian access connections, and parks <br /> shall not exceed 3:1 unless approved otherwise by the MHCSD General Manager. <br /> n. Development and landscaping of Western Community Gateway, or other landscaping <br /> features as determined by the General Manager, at Byron Road shall be installed <br /> concurrently with the landscaping of adjacent streets or bonded for at the discretion of <br /> MHCSD. Such features shall be designed consistent with all Community Approvals <br /> including applicable provisions of the MHCSD Design Manual, and shall be reviewed and <br /> approved by the MHCSD General Manager concurrently with the adjacent Street <br /> Improvement Plans. <br /> Timing: Improvement Plans for the landscaping feature at Byron Road shall be approved <br /> by MHCSD prior to the approval of the project's Final Map. Completion time may be <br /> modified by the MHCSD General Manager to reflect construction, weather, budget, or <br /> other public interest contingencies. <br /> Resolution Template 01/2017 <br />