Laserfiche WebLink
vi. LAMMERSVILLE UNIFIED ELEMENTARY SCHOOL DISTRICT (Staff Contact <br /> Doris Unsod, 209-836-7400) <br /> 1. The developer shall enter into full mitigation agreement with the Lammersville Elementary School <br /> District (LESD). [Master Plan Implementation 5.1.3 (j).] <br /> Timing: Condition shall be met prior to approval of the first Final Map. <br /> 2. The school funding agreements between the applicant and Lammersville Elementary School District <br /> and Tracy Unified School District shall be implemented to provide interim and permanent funding for <br /> school facilities, as evidenced by certificates of compliance from these entities stating that the <br /> developer has complied with funding requirements as per the agreements. [SPI II Implementation <br /> Measure 5.2.3 (o).] <br /> Timing: Condition shall be met prior to approval of Final Maps. <br /> \/11 TRACY I IAIICICrI SCHOOL DIST <br /> /S+aff Cnn+an+ Denise Wakefield <br /> 209-830 324 5) <br /> 1. The developer shall enter'ntp- flu" mitigatien agreemeRt with the TraGy uRifiedd R-r-AhIAGA-11 DiGtFiGt(TUSID). <br /> [Master Olen Implementation 5 1 2 !i\1 <br /> i <br /> Timing: Condition shall he met prior to approval of the first Final snap <br /> 2. The school funding agreements between the applicant and LESD and TUSD shall be implemented to <br /> provide interim and permanent funding for school faGilities, as evidenced by certificates of compliance <br /> from these entities stating that the developer has GGMplied with funding requiremeRts as per the <br /> agreeMe;+s [SPIII Impl emen+a+•�Measure G 2 Z (o).] <br /> Timing: Condition shall he met prior to approval of Canal maps <br /> viii. SAN JOAQUIN COUNCIL OF GOVERNMENTS (Staff Contact Erin <br /> Sickler, 209-468-3913) <br /> 1. This project is subject to the San Joaquin Multi-Species Habitat Conservation and Open Space Plan <br /> (SJMSCP). As such, the developer shall complete the following steps to satisfy SJMSCP <br /> requirements: <br /> a) Schedule a SJMSCP Biologist to perform a pre-construction survey prior to any ground <br /> disturbance. <br /> b) Sign and return to SJMSCP staff of SJCOG the Incidental Take Minimization Measures (given to <br /> the developer by SJMSCP staff after the pre-construction has been completed). <br /> c) Pay to SJCOG the SJMSCP fee based on SJMSCP findings. <br /> ixviil. State Department of Water Resources <br /> If the project encroaches on an adopted flood control plan, an encroachment permit from the Reclamation <br /> Board will be required. <br /> Ix. San Joaquin County Mosquito & Vector Control District <br /> 1. Any development immediately adjacent to Dry Creek shall be constructed and managed to <br /> provide access to the waterway for vector surveillance and control activities. <br /> 2. The Wetlands Management Plan shall include provisions to prevent the creation of mosquito <br /> breeding habitat in a wetlands environment. It is suggested that the project proponent <br /> Resolution Template 01/2017 <br />