My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0008843
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
6041
>
2600 - Land Use Program
>
PA-1100129
>
SU0008843
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:33:42 AM
Creation date
9/6/2019 10:39:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0008843
PE
2632
FACILITY_NAME
PA-1100129
STREET_NUMBER
6041
Direction
E
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
APN
04923011
ENTERED_DATE
8/1/2011 12:00:00 AM
SITE_LOCATION
6041 E KETTLEMAN LN
RECEIVED_DATE
8/1/2011 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\K\KETTLEMAN\6041\PA-1100129\SU0008843\APPL.PDF \MIGRATIONS\K\KETTLEMAN\6041\PA-1100129\SU0008843\CDD OK.PDF \MIGRATIONS\K\KETTLEMAN\6041\PA-1100129\SU0008843\EH COND.PDF \MIGRATIONS\K\KETTLEMAN\6041\PA-1100129\SU0008843\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jahn Funderburg -2- <br /> Community Development Department <br /> PA-1 100129 (SA) <br /> 3. The Traffic Impact Mitigation Pee shall be required for this development. The fee is due and <br /> payable at the time of building permit application for both phases of the project. The fee shall be <br /> automatically adjusted July I of each year by the Engineering Construction Cost Index as <br /> published by the Engineering News Record. (Resolution R-00-433) <br /> 4, The Regional Transportation Impact Fee shall be required for this development. The fee is due and <br /> payable at the time of building permit application for both phases of the project. The fee will be <br /> based on the current schedule at the time of payment. (Resolution R-06-38) <br /> 5. A copy of the Final Site Plan steal I be submitted prior to release of building,permit. <br /> e. Verification shall be obtained front the Solid Waste Division (468-3066) that this development has <br /> met the requirements of the Waste flan Format for Development Projects, Final Site Plan is <br /> required upon submittal of verification. <br /> 7. The developer shall expand existett t}--sit, drainage taeilities provide drainage facilities and meet <br /> the requirements of San Joaquin County.Dcvelopruent Standards to prevent the increased runoff <br /> release rate of storm water front discharging onto other properties and to prevent offsite sediment <br /> transport. The retention basin shall be fenced with six (6) foot high chain link fence or equal. <br /> Require(] retention basin capacity shall be calculated by a registered civil engineer, licensed <br /> contractor or licensed architect and subrrti.tted for review and approval along with a drainage plan, <br /> prior to release of building peri-nit. (Development Title Section 9-1135) <br /> S. The construction phase of Phase I and Phase 2 of the proposed project shall follow the practices in <br /> the County-Sntall Site Storrn Water Management Plan". <br /> Informational Notes: <br /> (i.) This property is subject to the requirements of San Joaquin County Mosquito & Vector Control <br /> District (209-982-4675) and the California I Iealt.h and Safety Code for the prevention of <br /> mosquitoes. Best N1anagernent Practices (BMP) guidelines for stormwater devices, ponds and <br /> wetlands are available. <br /> (ii.) All .future building permits for projects located within a Special Flood Hazard Area at the time of <br /> permit issuance shall meet the San Joaquin County flood hazard reduction requirements (Title 9, <br /> Chapter 9-1605)and all requirements of the State of California (CCR Title 23) that are in force at <br /> the time of permit issuance. As an example, these requirements may include raising the finish <br /> floor elevation one foot above the expected flood level and/or using flood resistant materials. <br /> ACIDS <br /> i.Sjpx,kat.arg Lshnres!Det.Srrs ices'DPubSt n',C'O tfifE;�`7S'S'A'f'K 2011.PA-11001129(Defter Packing Facility-l;ettleman Lit}IPA-1100119 REV'doe <br />
The URL can be used to link to this page
Your browser does not support the video tag.