Laserfiche WebLink
Table ES-1. Continued Page 6 of 10 <br /> Significance After <br /> Significance Mitigation <br /> Impact without Mitigation Mitigation Measure Incorporated <br /> Impact GW-2: Reclamation-Related Impacts on Groundwater Significant Mitigation Measure GW-la: Monitor Groundwater Less than Significant <br /> Quality Quality;Implement Measures to Maintain <br /> Groundwater Levels as Necessary <br /> Mitigation Measure GW-lb: Maintain Well Offsets <br /> Impact GW-3: Reductions in Groundwater Levels Caused by Significant Mitigation Measure GW-3: Monitor and Report Less than Significant <br /> Dewatering Groundwater Levels;Implement Measures to <br /> Maintain Groundwater Levels as Necessary <br /> Impact GW4: Reductions in Groundwater Levels Caused by Less than No mitigation is required — <br /> Consumptive Use Significant <br /> Hazards and Hazardous Materials <br /> Impact HAZ-1: Potential Hazards Related to Disposal of Less than No mitigation is required — <br /> Hazardous Materials at the Project Site Significant <br /> Impact HAZ-2: Release of Hazardous Materials into the Significant Mitigation Measure HAZ-2a: Require Submittal of Less than Significant <br /> Environment in the Event of Upset or Accident a Hazardous Materials Management Plan <br /> Mitigation Measure HAZ-2b: Require That Routine <br /> Vehicle Maintenance Occur in a Designated Area <br /> with an Impermeable Surface <br /> Impact HAZ-3: Release of Potentially Hazardous Materials into Less than No mitigation is required — <br /> Surface Water in the Event of Flooding of Project Facilities Significant <br /> Impact HAZ-4: Emit Hazardous Emissions or Handle Hazardous No Impact No mitigation is required <br /> or Acutely Hazardous Materials, Substances,or Waste within <br /> 0.25 Mile of an Existing or Proposed School <br /> Impact HAZ-5: Located on a Site that is Included on a List of Significant Mitigation Measure HAZ-5: Perform Soil Sampling Less than Significant <br /> Hazardous Materials Sites Compiled Pursuant to Government for Environmentally Persistent Pesticides Prior to <br /> Code Section 65962.5 Excavation <br /> Impact HAZ-6: Impair Implementation of or Physically Interfere Less than No mitigation is required <br /> with an Adopted Emergency Response Plan or Emergency Significant <br /> Evacuation Plan <br />