Laserfiche WebLink
w , i 1 i I i 1 I I ( f r r <br /> Table ES-1. Continued Page 7 of 10 <br /> Significance After <br /> Significance Mitigation <br /> Impact without Mitigation Mitigation Measure Incorporated <br /> Impact HAZ-7: Located within 2 Miles of a Public Airport or No Impact No mitigation is required — <br /> Private Airstrip and Result in a Safety Hazard for People <br /> Residing or Working in the Project Area <br /> Impact HAZ-8: Expose People or Structures to a Significant Significant Mitigation Measure HAZ-8: Implement Fire Safety Less than Significant <br /> Risk of Wildland Fires Recommendations of the Tracy Fire Department <br /> Impact HAZ-9: Exposure of Public to Potential Disease Vectors Significant Mitigation Measure HAZ-9: Implement Vector Less than Significant <br /> (Mosquitoes) Controls for Mosquito Populations at the Mine Site <br /> Noise <br /> Impact N-I: Exposure of Noise-Sensitive Land Uses to Noise Significant Mitigation Measure N-1: Employ Noise-Reducing Less than Significant <br /> during Construction and Reclamation Activities in Excess of Practices during Construction and Reclamation <br /> County Noise Ordinance Standards Activities <br /> Impact N-2: Exposure of Noise-Sensitive Land Uses to Significant Mitigation Measure N-2: Employ Noise-Reducing Less than Significant <br /> Equipment Noise during Mining Operations in Excess of County Operational Practices <br /> Stationary Noise Ordinance Standards <br /> Impact N-3: Exposure of Noise-Sensitive Land Uses to Noise in Less than No mitigation is required — <br /> Excess of County Transportation Noise Standards Significant <br /> Public Services and Utilities <br /> Impact PUB-1: Increased Demand for Water Supply Resulting in Significant Mitigation Measure GW-la: Monitor Groundwater Less than Significant <br /> Alteration or Need for Expansion of Water Supply Systems Quality;Implement Measures to Maintain <br /> Groundwater Levels as Necessary <br /> Mitigation Measure GW-lb: Maintain Well Offsets <br /> Mitigation Measure GW-3: Monitor and Report <br /> Groundwater Levels;Implement Measures to <br /> Maintain Groundwater Levels as Necessary <br /> Impact PUB-2: Increased Demand for Wastewater Treatment No Impact No mitigation is required — <br /> Resulting in Alteration or Need for Expansion of Services <br /> Impact PUB-3: Increased Generation of Solid Waste Resulting in Less than No mitigation is required — <br /> Alteration or Need for Expansion of Services Significant <br />