Laserfiche WebLink
San Joaquin County Community Introduction <br /> Development Department <br /> ■ Air Quality <br /> ■ Noise <br /> ■ Traffic <br /> ■ Cumulative Impacts <br /> As indicated by the above list,the scope of this EIR includes potential project <br /> effects on a range of resources, identified in the initial study and during the <br /> ` public scoping process as being sensitive to potential impacts. This EIR also <br /> analyzes cumulative and growth-related impacts. The resources and topics <br /> addressed in the EIR are listed below. <br /> ■ Aesthetics <br /> ■ Agricultural Resources, Land Use,and Planning <br /> ` ■ Air Quality <br /> ■ Biological Resources <br /> r ■ Cultural Resources <br /> ■ Geology and Soils <br /> fr ■ Surface Water, Stormwater, and Water Quality <br /> ■ Groundwater and Groundwater Quality <br /> ■ Hazards and Hazardous Materials <br /> ■ Noise <br /> ■ Public Services and Utilities <br /> ■ Traffic <br /> EIR Review Process <br /> The draft EIR is available for review and comment by the public, responsible <br /> agencies,organizations, and other interested parties for a 45-day period. All <br /> continents or questions about the EIR should be addressed to: <br /> Raymond Hoo, Senior Planner <br /> San Joaquin County <br /> ` Community Development Department <br /> P.O.Box 1818 <br /> 1810 E.Hazelton Avenue <br /> Stockton,CA 95205 <br /> Comments on the draft EIR received during the review period will be used to <br /> prepare a final EIR. The final EIR will include written responses to all <br /> comments received,and will be made available for public review before <br /> consideration of the project by the San Joaquin County Planning Commission <br /> DeSilva Gates Quarry Project <br /> Draft Environmental Impact Report 1-3 <br /> J8a 05105.05 <br />