Laserfiche WebLink
Dust Control Plan <br /> Section 3 — Fugitive PM10 Sources — Page 1 <br /> Project Name: <br /> 3-A Disturbed Surface Area <br /> Report the total area of land surface to be disturbed, the daily throughput volume of earthmoving in cubic <br /> yards, and the total area in acres of the entire project site: (Rule 8021 Sec.6.3.6,3) T <br /> Total area of land surface to be disturbed: Acres <br /> Daily maximum throughput volume of earthmoving: Cubic Yards <br /> Daily average throughput volume of earthmoving: Cubic Yards <br /> Total area of entire project site: Acres <br /> Total disturbed areas that will be left inactive for more than seven days: Acres <br /> 3-13 Dust Generating Activity Dates <br /> The expected start and completion dates of dust generating activities and soil disturbance activities to <br /> be performed on site. For phased projects, it may be necessary to report expected start and completion <br /> dates separately. (Rule 6021 Sec.6.3.6.4) <br /> Expected start date: Completion Date: r <br /> Phase Project Start—A: Completion —A: <br /> Phase Project Start— B: Completion — B: j <br /> Phase Project Start—C: Completion — C: <br /> 3-C Other Locations <br /> Identify whether any other locations should be included with this plan that are involved with this project. An 1 <br /> example may include listing any site where materials will be imported from or exported to. (Rule 8021 Sec.6.3.2) <br /> ❑ No other locations are included with this project. (Skip to 3-D) r <br /> Location 1: <br /> ❑ No Dust Control Plan Required ❑ Included with this plan ❑ Included with another plan <br /> Location 2: r <br /> ❑ No Dust Control Plan Required ❑ Included with this plan ❑ Included with another plan I <br /> Location 3: <br /> ❑ No Dust Control Plan Required ❑ Included with this plan ❑ Included with another plan <br /> 10/14/2004 <br />