Laserfiche WebLink
- Section 3 — Fugitive PM10 Sources — Page 2 <br /> Project Name: <br /> 3-D Sources of Fugitive Dust <br /> This section describes the minimum requirements for limitingvisible dust emissions from activities that <br /> cause fugitive dust emissions. (Rule 8021 sec.6.3.6.5) Check at least one box under each category. <br /> Structural Demolition. (Rule 8021 Sec.5.1,6.3.3, &6.3.6.5) <br /> ❑ No demolitions are planned for this project. <br /> ❑ Asbestos NESHAP notification and fees have been submitted to the District. (Rule 3050 and Rule 4002). <br /> ❑ Water will be applied to the following areas for the duration of the demolition activities: <br /> • Building exterior surfaces; <br /> • Unpaved surface areas where equipment will operate; <br /> • Razed building materials; and <br /> • Water or dust suppressants will be applied to unpaved surface areas within 100 feet of structure <br /> during demolition. <br /> Pre-Activity. (Rule 8021 Sec.5.2) <br /> ❑ Not applicable for this project (Please explain why in Section 3-F). <br /> ❑ The site will be pre-watered and work will be phased to reduce the amount of disturbed surface area at <br /> any one time (Complete Section 4-A). <br /> Active Operations. (Rule 8021 sec.5.2) <br /> ❑ Water will be applied to dry areas during leveling, grading, trenching, and earthmoving activities (Complete <br /> Section 4-A). <br /> ❑ Wind barriers will be constructed and maintained, and water or dust suppressants will be applied to the <br /> disturbed surface areas (Complete Sections 4-A or 4-B, and 4-C). <br /> Inactive Operations, including after work hours, weekends, and holidays. (Rule 8021 Sec.5.2) <br /> ❑ Not applicable for this project (Please explain why in Section 3-F). <br /> ❑ Water or dust suppressants will be applied on disturbed surface areas to form a visible crust, and vehicle <br /> access will be restricted to maintain the visible crust. (Complete Section 4-A or 4-B, and 4-C) <br /> Temporary stabilization of areas that remain unused for seven or more days. (Rule 8021 sec.5.2) <br /> ❑ Not applicable for this project (Please explain why in Section 3-F) <br /> ❑ Vehicular access will be restricted and water or dust suppressants will be applied and maintained at all un- <br /> vegetated areas (Complete Section 4-A or 4-B, and 4-C). <br /> ❑ Vegetation will be established on all previously disturbed areas (Complete Section 4-C). <br /> ❑ Gravel will be applied and maintained at all previously disturbed areas (Complete Section 4-C). <br /> ❑ Previously disturbed areas will be paved (Complete Section 4-C). <br /> Unpaved Access and Haul Roads, Traffic and Equipment Storage Areas. (Rule 8021 sec.5.2 and 5.3) <br /> ❑ Not applicable for this project (Please explain why in Section 3-F) <br /> ❑ Apply water or dust suppressants to unpaved haul and access roads (Complete Section 4-A or 4-B) <br /> ❑ Post speed limit signs of not more than 15 miles per hour at each entrance, and again every 500 feet. <br /> (Complete Section 4-C) <br /> ❑ Water or dust suppressants will be applied to vehicle traffic and equipment storage areas (Complete <br /> Section 4-A or 4-B). <br /> Wind Events. (Rule 8021 Sec.5.4) <br /> ❑ Water application equipment will apply water to control fugitive dust during wind events, unless unsafe <br /> to do so. <br /> _ Outdoor construction activities that disturb the soil will cease whenever visible dust emissions cannot <br /> be effectively controlled. <br /> 10/14/2004 <br />