Laserfiche WebLink
5-5 Predicted Cumulative Mining and Traffic Noise Levels, <br /> Mining Equipment Operating at North Pit Stage III, with <br /> Mine Operating Hours between 5:00 a.m. and 9:00 p.m........................5-9 <br /> 5-6 Predicted Cumulative Mining and Traffic Noise Levels, <br /> Mining Equipment Operating at North Pit Stage III, 24-Hour <br /> MiningOperations.................................................................................5-10 <br /> DeSilva Gates Quarry Project <br /> Draft Environmental Impact Report xi <br /> JSS 05105.05 <br />