Laserfiche WebLink
3.1--38 DeSilva Gates Quarry Year 2027 Peak Daily Truck Trip <br /> Generation.........................................................................................3.L-32 _ <br /> 3.1--39 Year 2027 Plus Project Hourly Truck Loading Frequencies <br /> and Estimated Hourly Truck Generation............................................3.L-33 <br /> 3.1--40 Year 2027 Baseline and Year 2027 Plus Project Peak <br /> Hour Intersection Operations with Proposed SR 132/Bird — <br /> Road Interchange (Worst-Case Alternative)......................................3.L-34 <br /> 3.1-41 SR 132 between 1-5/Bird Road Interchanges Weaving — <br /> Operations Year 2027 Baseline and Year 2027 Plus <br /> Project Conditions' Levels of Service (LOS) with Four-Lane <br /> Freeway with Proposed SR 132/Bird Road Interchange _ <br /> (Worst-Case Alternative) ...................................................................3.L-35 <br /> 3.1--42 I-5/SR 132 Interchange Weaving Sections Analysis Year <br /> 2027 Plus Project LOS ......................................................................3.L-36 <br /> 3.1--43 SR 132/Bird Road Interchange Ramp Junction Operations <br /> Year 2027 Baseline and Year 2027 Baseline Plus Project <br /> Conditions' LOS with Four-Lane Freeway (Worst-Case <br /> Alternative).........................................................................................31-36 <br /> 3.1--44 Year 2027 Baseline and Year 2027 Baseline Plus Project <br /> Conditions' Roadway Segment LOS with Proposed SR <br /> 132/Bird Road Interchange (Worst-Case Alternative) .......................3.L-37 <br /> 3.2-45 Estimated 2027 Plus Project Roadway Traffic Index (TI) <br /> Values by Direction of Travel.............................................................3.L-38 <br /> 4-1 Summary of Emissions from Project Operation <br /> (tons per year)— New Alternative...............................................follows 4-6 _ <br /> 5-1 Predicted Cumulative Mining and Traffic Noise Levels, <br /> Mining Equipment Operating at North Pit Stage I, with Mine _ <br /> Operating Hours between 5:00 a.m. and 9:00 p.m.................................5-7 <br /> 5-2 Predicted Cumulative Mining and Traffic Noise Levels, <br /> Mining Equipment Operating at North Pit Stage I, 24-Hour — <br /> MiningOperations...................................................................................5-8 <br /> 5-3 Predicted Cumulative Mining and Traffic Noise Levels, <br /> Mining Equipment Operating at North Pit Stage II, with <br /> Mine Operating Hours between 5:00 a.m. and 9:00 p.m........................5-8 <br /> 5-4 Predicted Cumulative Mining and Traffic Noise Levels, <br /> Mining Equipment Operating at North Pit Stage II, 24-Hour <br /> MiningOperations...................................................................................5-9 <br /> DeSilva Gates Quarry Project <br /> Draft Environmental Impact Report X <br /> J8s 05105.05 <br />