My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004098
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
35775
>
2600 - Land Use Program
>
PA-0300550
>
SU0004098
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:30:31 AM
Creation date
9/6/2019 10:43:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004098
PE
2605
FACILITY_NAME
PA-0300550
STREET_NUMBER
35775
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
35775 S KOSTER RD
RECEIVED_DATE
3/10/2004 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\K\KOSTER\35775\PA-0300550\SU0004098\APPL.PDF \MIGRATIONS\K\KOSTER\35775\PA-0300550\SU0004098\CDD OK.PDF \MIGRATIONS\K\KOSTER\35775\PA-0300550\SU0004098\EH COND.PDF \MIGRATIONS\K\KOSTER\35775\PA-0300550\SU0004098\CORRESPOND.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
683
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.1--38 DeSilva Gates Quarry Year 2027 Peak Daily Truck Trip <br /> Generation.........................................................................................3.L-32 _ <br /> 3.1--39 Year 2027 Plus Project Hourly Truck Loading Frequencies <br /> and Estimated Hourly Truck Generation............................................3.L-33 <br /> 3.1--40 Year 2027 Baseline and Year 2027 Plus Project Peak <br /> Hour Intersection Operations with Proposed SR 132/Bird — <br /> Road Interchange (Worst-Case Alternative)......................................3.L-34 <br /> 3.1-41 SR 132 between 1-5/Bird Road Interchanges Weaving — <br /> Operations Year 2027 Baseline and Year 2027 Plus <br /> Project Conditions' Levels of Service (LOS) with Four-Lane <br /> Freeway with Proposed SR 132/Bird Road Interchange _ <br /> (Worst-Case Alternative) ...................................................................3.L-35 <br /> 3.1--42 I-5/SR 132 Interchange Weaving Sections Analysis Year <br /> 2027 Plus Project LOS ......................................................................3.L-36 <br /> 3.1--43 SR 132/Bird Road Interchange Ramp Junction Operations <br /> Year 2027 Baseline and Year 2027 Baseline Plus Project <br /> Conditions' LOS with Four-Lane Freeway (Worst-Case <br /> Alternative).........................................................................................31-36 <br /> 3.1--44 Year 2027 Baseline and Year 2027 Baseline Plus Project <br /> Conditions' Roadway Segment LOS with Proposed SR <br /> 132/Bird Road Interchange (Worst-Case Alternative) .......................3.L-37 <br /> 3.2-45 Estimated 2027 Plus Project Roadway Traffic Index (TI) <br /> Values by Direction of Travel.............................................................3.L-38 <br /> 4-1 Summary of Emissions from Project Operation <br /> (tons per year)— New Alternative...............................................follows 4-6 _ <br /> 5-1 Predicted Cumulative Mining and Traffic Noise Levels, <br /> Mining Equipment Operating at North Pit Stage I, with Mine _ <br /> Operating Hours between 5:00 a.m. and 9:00 p.m.................................5-7 <br /> 5-2 Predicted Cumulative Mining and Traffic Noise Levels, <br /> Mining Equipment Operating at North Pit Stage I, 24-Hour — <br /> MiningOperations...................................................................................5-8 <br /> 5-3 Predicted Cumulative Mining and Traffic Noise Levels, <br /> Mining Equipment Operating at North Pit Stage II, with <br /> Mine Operating Hours between 5:00 a.m. and 9:00 p.m........................5-8 <br /> 5-4 Predicted Cumulative Mining and Traffic Noise Levels, <br /> Mining Equipment Operating at North Pit Stage II, 24-Hour <br /> MiningOperations...................................................................................5-9 <br /> DeSilva Gates Quarry Project <br /> Draft Environmental Impact Report X <br /> J8s 05105.05 <br />
The URL can be used to link to this page
Your browser does not support the video tag.