Laserfiche WebLink
Traffic Impact Study March 24,2004 <br /> Proposed RMC Pacific Mining Site Page i <br /> TABLE OF CONTENTS <br /> Paee — <br /> 1.0 INTRODUCTION........................................................................................................................ 1 <br /> 2.0 PROPOSED PROJECT.............................................................................................................. 1 <br /> 3.0 APPROVED PROJECTS ........................................................................................................... 1 <br /> 4.0 STUDY AREA AND TIME PERIOD........................................................................................ 1 <br /> 5.0 EXISTING LANE CONFIGURATIONS.................................................................................. 2 <br /> 6.0 TRAFFIC ANALYSES ............................................................................................................... 2 <br /> 6.1 Project and Approved Project Traffic Volumes.................................................................2 <br /> 6.2 Existing and Cumulative Traffic Volumes........................................................................ 3 <br /> 6.3 Future (Year 2025) Traffic Volumes.................................................................................3 <br /> 6.4 Level of Service.................................................................................................................4 <br /> 6.5 Discussion of Analyses...................................................................................................... 5 <br /> 7.0 FAIR-SHARE PERCENTAGE.................................................................................................. 9 — <br /> 8.0 CONCLUSIONS AND RECOMMENDATIONS................................................................... 10 <br /> TABLES <br /> 1 Project Trip Generation — <br /> 2 Traffic Index (20-Year) Summary <br /> 3 Level of Service Characteristics for Unsignalized Intersections <br /> 4 Level of Service Characteristics for Signalized Intersections <br /> 5 AM Peak Hour Intersection Level of Service Summary <br /> 6 AM Peak Hour Road Segment Level of Service Summary <br /> 7 AM Peak Hour Fair Share Calculations—Haul Route 1 — <br /> 8 AM Peak Hour Fair Share Calculations—Haul Route 2 <br /> FIGURES <br /> 1 Site Vicinity Map <br /> 2 Trip Distribution Percentages—Haul Route 1 <br /> 3 Trip Distribution Percentages—Haul Route 2 <br /> 4 Intersection and Segment Location Map <br /> 5 Existing Lane Configurations <br /> 6 Existing Lane Configurations <br /> 7 Project Traffic Volumes—Haul Route 1 <br /> 8 Project Traffic Volumes—Haul Route 1 <br /> 9 Project Traffic Volumes—Haul Route 2 <br /> 10 Project Traffic Volumes—Haul Route 2 <br /> 11 Approved-Project Traffic Volumes—Granite Site <br /> 12 Approved-Project Traffic Volumes—Granite Site <br /> 13 Existing Traffic Volumes <br /> 14 Existing Traffic Volumes <br />