My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004094
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
36736
>
2600 - Land Use Program
>
QX-01-0002
>
SU0004094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2020 1:02:10 PM
Creation date
9/6/2019 10:43:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004094
FACILITY_NAME
QX-01-0002
STREET_NUMBER
36736
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
36736 S KOSTER RD
RECEIVED_DATE
1/8/2002 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\K\KOSTER\36736\QX-01-02_PA-0200065\SU0004094\EIR 2004.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2073
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. EXECUTIVE SUMMARY <br /> TABLE 2-1 (Continued) <br /> SUMMARY OF IMPACTS AND NMGATION MEASURES <br /> LEVEL OF <br /> ENVIRONMENTAL IMPACT MITIGATION MEASURES SIGNIFICANCE <br /> AFTER MITIGATION <br /> 4.4-1b As a condition of approval,the applicant will be required to <br /> contribute an equitable share of the cost of the construction of a <br /> new interchange at SR 132 and Bird Road. Caltrans has <br /> approved a Project Study Report for an interchange to replace <br /> the existing intersection. The proposed interchange is expected <br /> to mitigate the cumulative impacts to the intersection. <br /> 4.4-2 The project would increase traffic on regional roadways 4.4-2 The project sponsor will be required to contribute an equitable LS <br /> in the project vicinity. This would be a potentially share of the cost of the widening of SR 132 to two lanes in each <br /> significant impact. direction between 1580 and McCracken Road. With <br /> construction of two lanes in each direction,SR 132 is expected <br /> to experience acceptable levels of service through the year <br /> 2025. <br /> 4.4-3 If Haul Route Option 2 is approved,project-generated 4.4-3 If Haul Route Option 2 is approved,the project applicant would LS <br /> haul truck traffic would cause an increased traffic safety be required to negotiate with the San Joaquin County <br /> hazard at the intersection of State Route 132 and Koster Department of Public Works and the State Department of <br /> Road. This would be a potentially significant impact. Transportation(Caltrans)regarding the project's fair share <br /> contribution to necessary upgrades to the intersection of SR 132 <br /> and Koster Road(including left-tum lanes,and <br /> acceleration/deceleration lanes). <br /> 4.4-4 Project generated traffic could result in accelerated Pavement Upgrades and Replacement LS <br /> pavement deterioration on study area roadways. This <br /> would be a potentially significant impact. <br /> RMC Pacific Vesnalis Quany Mining and Reclamation Project 2-9 FSA/103015 <br /> Administrative Draft 1IIR Match 2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.