Laserfiche WebLink
2 EXECUTIVE SUMMARY <br /> TABLE 2-1 (Continued) <br /> SUMMARY OF IMPACTS AND MITIGATION MEASURES <br /> LEVEL OF <br /> ENVIRONMENTAL IMPACT MITIGATION MEASURES SIGNIFICANCE <br /> AFTER MITIGATION <br /> AGRICULTURAL RESOURCES <br /> 4.3.1 Implementation of the Proposed Project would result in 4.3.1 The applicant or successors-in-interest shall be responsible for Significant and <br /> the conversion of Prime Farmland and Farmland of funding of an agricultural land easement through the American Unavoidable <br /> Statewide Importance. This would be a significant Farmland Trust(or other suitable organization). The fees paid <br /> impact. shall be used for the sole purpose of purchasing,holding,and/or <br /> maintenance of agricultural land conservation easements. <br /> 4.3.2 The Proposed Project would not significantly conflict No mitigation is required. <br /> with the existing agricultural zoning of the subject <br /> properties nor with the provisions of an existing <br /> Williamson Act contract. This would be a less-than- <br /> significant impact. <br /> 4.3.3 Mining activities have the potential to result in off-site 4.3.3 Implement Mitigation Measure 4.6.1 to control the generation Less-than-Significant <br /> impacts to adjacent agricultural lands. This would be a of fugitive dust during mining activities. <br /> potentially significant impact. <br /> 4.3.4 Deep pit aggregate extraction will reduce the 4.3.4a The Reclamation Plan for the proposed project shall be Less-than-Significant <br /> agricultural productivity of the project site. This would modified to incorporate elements of a comprehensive soil <br /> be a potentially significant impact. resource extraction,maintenance and reintroduction plan. The <br /> ultimate goal of the plan will be to ensure the future <br /> productivity of the soil resource and its availability for future <br /> agricultural cultivation in compliance with the performance <br /> standards for prime agricultural land reclamation,PRC Section <br /> 3707 Appendix B At a minimum,the plan shall consist of the <br /> following elements: <br /> RMC Pacific Vernalis Quarry Mining and RxLvnation Project 2-6 <br /> 15 <br /> Administrative Draft Erg FSAMarch <br /> 201004 <br /> h^_(104 <br />