3. PROJECT DESCRIPTION <br /> • Batch tower <br /> • Aggregate bins <br /> • Baghouse <br /> • Hot oil tanks <br /> PAVEMENT RECYCLING <br /> Concrete comeback and waste concrete from the batch plant would be stockpiled for recycling. <br /> Approximately 100,000 tons of material per year would be recycled. An inert landfill may be <br /> included at the project t site. The types of material that would be placed in the inert landfill would <br /> inclu a concrete,cleanfill,rock,aggregate,brick,approved concrete pipe, asphalt,etc. After the <br /> landfill area is filled,it will be capped and returned to agriculture. If concrete and asphalt are <br /> brought to the site any metal and rebar will be removed and hauled off the site to be sold as scrap. <br /> The operation of an inert landfill would require obtaining permits from the California Integrated <br /> Waste Management Board and the County Environmental Health Department. <br /> MAINTENANCE SHOP <br /> The facility would have an equipment maintenance shop approximately 4,500 square feet in size <br /> ` and would be located at the plant site in Phase IX. <br /> r <br /> PORTABLE PLANT <br /> A portable concrete/asphalt pavement recycling plant will be intermittently brought on-site by an <br /> independent operator. The plant will be located in the middle of the plant site. Broken concrete <br /> and asphalt pavement will be brought on-site and stockpiled until a sufficient volume has been <br /> generated to warrant a portable plant to be brought on-site to crush base material. A typical <br /> recycling plant would include: <br /> • Primary crusher <br /> • Secondary crusher <br /> • Screen decks <br /> • Power generator trailer <br /> • Conveyors <br /> • Office trailer <br /> • Stacker conveyor <br /> ` Portable office trailers will be placed during the construction phase in the Phase IX area just east <br /> of the main entrance. The offices will also serve as a scale house and will be approximately <br /> 1,800 square feet in size. Three scales approximately 80 feet long will be placed on concrete <br /> foundations. Wheel washers would be placed between the scales and the main entrance to assure <br /> that tracking of dirt onto South Costa Ranch Road is kept to a minimum. <br /> ` RMC Pacific Vemahs Quany Mining and Reclamation Project 3-17 ESA/203015 <br /> Adnwdsva w Deft Ead Mach 2004 <br />