Laserfiche WebLink
3. PROJECT DESCRIPTION <br /> 3.6.2 MINING OPERATIONS <br /> PHASING <br /> Mitring would be divided into nine phases beginning with Phase I. While mining Phase I,the <br /> Phase IV area would he temporarily bermed to create a silt pond using Phase I and Phase IV <br /> overburden. Once mining is completed in Phase I, it would be used for permanent silt _ <br /> containment and the silt temporarily contained in Phase IV would be pumped into the Phase I silt <br /> pond. Mining would continue to Phase II,III,IV,and so on until all phases have been mined. <br /> Once mining is completed in the Phase IV area,the pit would be used as a permanent silt pond — <br /> along with the silt pond in the Phase I area. If additional silt storage is needed during the course <br /> of mining,the Phase V area would be used as a silt pond. Phase IX will be mined once the <br /> structures including the aggregate plant are demolished and removed. The material excavated <br /> from Phase IX will be processed by a portable plant located on the capped settling pond in the <br /> Phase IV area. Tables 3-1 and 3-2 describe the elements of the mine phases. <br /> TABLE 3-1 <br /> PROPOSED PROJECT FEATURES AND CHARACTERISTICS <br /> Volume of Maximum <br /> Total Pit Volume of Volume of Material Depth of <br /> Mining Volume Overburden Top Soil Extracted* Extraction <br /> Operation Acres (cubic yards) (cubic yards) (cubic yards) (cubic yards) (feet) <br /> Phase 37.3 4,801,000 376,108 45,133 4,379,759 90 <br /> Phase U 84.8 11,882,000 855,067 102,608 10,924,325 92 — <br /> Phase III 73.4 11,385,000 740,117 88,814 10,556,069 105 <br /> Phase IN 75.4 9,166,000 760,283 91,234 8,314,483 94 <br /> Phase V 83.1 15,869,000 837,925 100,551 14,930,524 116 <br /> Phase VI 111.5 20,796,000 1,124,292 134,915 19,536,793 105 <br /> Phase VII 77.6 11,120,000 782,467 93,896 10,243,637 105 — <br /> Phase VIII 77.6 10,035,000 782,467 93,896 9,158,637 98 <br /> Phase IX 38 5,132,000 383,167 45,980 4,702,853 88 <br /> Total 659 100,189,000 6,644,917 797,390 92,746,693 <br /> * Material Extracted equals total pit volume less overburden and topsoil <br /> SOURCE: Spinardi Associates,2004. <br /> RMC Pacific vernalis Qnany Mining and Reclamation Project 3-18 FSA/203015 <br /> Admwistra w Draft ERR Match 2034 <br />