My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004094
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
36736
>
2600 - Land Use Program
>
QX-01-0002
>
SU0004094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2020 1:02:10 PM
Creation date
9/6/2019 10:43:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004094
FACILITY_NAME
QX-01-0002
STREET_NUMBER
36736
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
36736 S KOSTER RD
RECEIVED_DATE
1/8/2002 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\K\KOSTER\36736\QX-01-02_PA-0200065\SU0004094\EIR 2004.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2073
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. PROJECT DESCRIPTION <br /> Concrete Batch Plant <br /> — Conveyor transfer points <br /> — Loading of aggregate bins <br /> — Truck funnel(loading of ready mix trucks) <br /> Asphalt Plant <br /> — Conveyor transfer points <br /> — Loading of aggregate bins <br /> The applicant will be required to obtain Permits to Construct and Permits to Operate from the <br /> SJVUAPCD. A water truck will be used to spray all internal yard roads and stockpiles that are _ <br /> being used to load trucks. A bag house will be used on most crushers,dry screens,transfer <br /> points,and all plants to control airborne dust and emissions. <br /> HOURS OF OPERATIONS <br /> The plant facility's hours of operation for both excavation and processing will be 24 hours per <br /> day, 6 days a week(Monday through Saturday)with maintenance on Sundays. <br /> PORTABLE PLANT <br /> While the permanent plant is being constructed, a portable temporary plant would be used for a <br /> period of about two years to process approximately 500,000 tons per year of material. — <br /> 3.6.4 RECLAMATION _ <br /> The Applicant and its consultants have prepared a reclamation plan for the RMC Pacific Vernalis <br /> Quarry,dated October 2003,pursuant to the requirements of the Surface Mining and Reclamation <br /> Act(SMARA) and the County's mining ordinance. <br /> PHASING <br /> Reclamation would begin within two years after a phase of mining is completed. Upon <br /> termination of mining activities at the quant',the plant,office,and other structures and objects <br /> would be removed and the area graded and leveled. The processing plant, structures,and all of <br /> the processing equipment would be removed from the site. Buildings(offices, shops, etc.)would <br /> be demolished and removed from the site. All concrete foundations would be excavated and _ <br /> removed and underground electrical conduit and water pipelines would be excavated, removed, <br /> and properly disposed of at an off-site location. Electrical equipment, transformers,power poles, <br /> and power lines would all be removed from the site. _ <br /> The two leased parcels (Phase R and III areas) would be reclaimed first and returned to <br /> agricultural use. All other areas,except the silt ponds would be mined and reclaimed back to — <br /> agriculture use to the elevations shown on the Reclamation Plan. All silt ponds would be <br /> stabilized and capped with overburden to the same approximate elevation as Blewett Road and <br /> RMC Pacific Vernalis Quany Mining and Reclamation Pmje, 3-24 ESA/203015 <br /> Admmishafive Draft EIR Mach 2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.